Run: Storm Sewer Inlet and Catch Basin Acceptance Inspection

Use this Storm Sewer Inlet and Catch Basin Acceptance Inspection template to verify new drainage structures are installed to plan before closeout. It capture...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details and Site Readiness

Record the project name, station/offset or address, structure identifier, and date of inspection.
Confirm the inlet or catch basin is accessible without unsafe entry, traffic exposure, or unstable ground conditions.
Confirm the approved plan, shop drawing, or as-built reference is available for field comparison.
Confirm conditions allow reliable measurement of elevations, sump depth, and pipe connections.
Capture overall structure view and key verification points.

Structure Condition and Installation

Check for tilt, rocking, differential settlement, or separation at joints.
Verify the frame and grate fit securely without rocking, excessive gaps, or protrusions that create a hazard or non-conformance.
Confirm the installed grate or cover matches the approved detail for the inlet or catch basin location.
Inspect precast or cast-in-place components for damage that could affect performance or durability.
Check for sediment, trash, concrete residue, or other debris that could obstruct flow.

Elevation, Sump, and Hydraulic Verification

Enter the final rim elevation measured in the field.
Enter the final invert elevation at the inlet or outlet as applicable.
Verify the measured invert elevation is within project tolerance of the approved design or as-built requirement.
Enter the measured sump depth below the outlet invert.
Confirm the installed sump depth meets the specified design or municipal standard.

Pipe Connections and Flow Path

Verify the storm sewer pipe is connected to the correct inlet or outlet opening and matches the approved configuration.
Check that the pipe enters the structure without visible misalignment, offset, leakage, or damaged joints.
Enter the measured invert elevation of the receiving pipe at the structure connection.
Confirm the inlet, sump, and connected pipe provide a clear flow path with no visible obstruction.

Safety, Documentation, and Closeout

Confirm the structure was managed safely during inspection and any temporary protection was maintained as needed.
Record any non-conformance, deficiency, or punch-list item requiring correction before acceptance.
Select the overall recommendation for the structure.
Inspector signs to confirm the acceptance review is complete.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?