Run: Plumbing Rough-In Inspection

Use this Plumbing Rough-In Inspection template to verify drain, waste, vent, support, and pressure-test work before wall closure. It helps catch hidden defic...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details

Enter project name, building/area, floor, and room or zone inspected.
Capture the date and time of the rough-in inspection.
Identify the inspector and inspecting company or trade partner.
Verify that the current approved plans and permit documentation are available for reference.

Drain, Waste, and Vent Piping

Confirm pipe routing matches the approved layout and avoids prohibited conflicts with structure or other trades.
Measure the installed slope where applicable and verify it meets the approved design and code requirements.
Verify vent piping is properly installed, connected, and routed to maintain drainage system venting.
Confirm traps are installed where required, are the correct type, and are not improperly modified or bypassed.
Check that cleanouts are present where required and remain accessible for maintenance and inspection.
Verify sleeves, firestopping, and protection at penetrations are installed where required by the design and AHJ.

Pipe Support and Protection

Verify piping is supported in accordance with the approved plans and applicable code requirements.
Check for visible sagging, strain at joints, or unsupported spans that could cause future failure.
Confirm piping is protected from nails, screws, abrasion, and other foreseeable construction damage.
Verify required sleeves, isolation, or insulation are installed at contact points and through framing members.

Pressure Test / Leak Test

Select the test performed for the rough-in inspection.
Enter the test pressure used during the inspection.
Enter the length of time the system held test pressure.
Verify there are no visible leaks, seepage, or pressure loss at joints, fittings, or fixtures.
Confirm the gauge is readable, properly connected, and suitable for the test being performed.

Final Readiness

Record all non-conformances, required corrections, and responsible parties before closing walls.
Confirm inspection approval or release from the Authority Having Jurisdiction, if required.
Confirm the area may be closed only after all critical items pass and required approvals are complete.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?