Run: Module Setting and Placement Record

Use this Module Setting and Placement Record to document prefabricated module set, survey verification, level and plumb checks, anchorage, interfaces, and cl...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details and Scope

Record the project name, module ID, set location, and work area.
Document when the module setting and placement inspection was performed.
Identify the installing contractor, competent person, and inspector.

Pre-Set Site and Foundation Readiness

Confirm the receiving surface is complete, clean, and capable of supporting the module.
Confirm control points, benchmarks, and reference elevations are established and protected.
Verify the module landing area is clear and safe for placement.
Document wind, precipitation, visibility, and ground conditions affecting safe placement.

Survey, Elevation, and Level Verification

Record measured elevation variance from design or benchmark.
Record out-of-level condition along the primary axis.
Record out-of-level condition along the secondary axis.
Verify module is plumb, aligned to grid, and oriented correctly relative to the set-out lines.

Connections, Anchorage, and Interface Checks

Confirm all required anchors, bolts, welds, or tie-downs are installed per specification.
Verify interface connections are complete and properly engaged.
Record measured torque or fastening value where applicable.
Confirm the module is stable and no temporary lifting equipment remains attached.

Tolerance, Quality, and Safety Verification

Confirm the installed module meets project tolerance requirements for position, elevation, and alignment.
Document any damage, deformation, or finish defects noted after placement.
Verify housekeeping, barricades, and access control are appropriate before turnover.

Deficiencies, Corrective Actions, and Sign-Off

Select all deficiencies identified during inspection.
Describe corrective actions, responsible party, and target completion date.
Inspector attestation that the record is complete and accurate.
Approval sign-off for acceptance or conditional acceptance of the module set.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?