Loading...

Run: Defibrillator Monthly Functional Check Log

Monthly log for each AED/defibrillator to confirm ready status, pad and battery readiness, access, and any corrective action before an emergency happens.

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details

Enter the AED or defibrillator identifier used by your site.
Record the exact mounted location or room where the device is stored.
Date and time the monthly functional check was completed.
Name of the person completing the inspection.

Device Self-Test and Status

Verify the AED status indicator shows a normal or ready condition with no fault alert.
Confirm there are no active alarms, warning tones, or fault signals.
Inspect the housing, screen, buttons, and carry case for cracks, missing parts, contamination, or other damage.
Confirm the device case or cabinet contains all required accessories and the compartment closes properly.

Pads and Electrode Readiness

Verify electrode pads are present, sealed, and not previously opened or used.
Check the pad package expiration date and confirm it has not passed.
Confirm the pad package is intact, dry, and free from tears, punctures, or seal failure.
Verify the pads are compatible with the AED model and intended patient use.

Battery and Power Readiness

Confirm the battery is installed correctly and the compartment is closed and secure.
Verify the battery indicator or device display shows adequate charge or readiness.
Record the battery expiration or replacement date if shown on the device or battery label.
If your site procedure requires a spare battery, confirm one is available and in date.

Accessibility, Signage, and Corrective Action

Confirm the defibrillator cabinet, wall mount, or storage location is accessible without obstruction.
Verify AED signage is visible and the device can be quickly identified in an emergency.
Mark Yes if any issue, non-conformance, or missing item was found during this inspection.
Document the deficiency, immediate action taken, and who was notified for repair or replacement.

Inspector Sign-off

Signature confirming the monthly functional check was completed.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free