Loading...

Run: BAS Sensor Calibration Field Verification

BAS Sensor Calibration Field Verification records field comparisons for temperature, pressure, humidity, and CO2 sensors against a calibrated reference instr...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details and Scope

Enter the site name, building, BAS system, and controlled area or zone being verified.
Document when the field verification was performed and who completed it.
Identify the sensor tag, point name, controller address, and associated BAS loop or zone.
Select all sensor types included in this verification.
Confirm the sensor, test port, or sampling location is reachable without unsafe access, exposed conductors, or other hazards.

Reference Instrument Verification

Document the calibrated reference instrument used for comparison.
Confirm the reference instrument calibration certificate or sticker is valid and not expired.
Enter the calibration expiration or due date for the reference instrument.
Verify the reference instrument was checked for zero, ambient, or baseline stability before use.
Document ambient conditions that may affect readings, such as temperature, airflow, or condensation.

Sensor Readings and Offset Calculations

Enter the BAS temperature reading and document the reference value and calculated offset in the comment field.
Enter the BAS pressure reading and document the reference value and calculated offset in the comment field.
Enter the BAS humidity reading and document the reference value and calculated offset in the comment field.
Enter the BAS CO2 reading and document the reference value and calculated offset in the comment field.

Controller Adjustment and Functional Check

Document the offset value applied at the controller for each adjusted point.
Confirm the correction was applied at the controller, point object, or BAS workstation as required by site procedure.
Verify the sensor reading after adjustment is within the site's acceptable tolerance or commissioning criteria.

Deficiencies, Corrective Actions, and Sign-Off

Describe any sensor drift, failed comparison, damaged probe, unstable reading, or other deficiency.
Indicate whether follow-up repair, replacement, reprogramming, or re-verification is needed.
Inspector or technician signs to confirm the field verification record is complete and accurate.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?