Taylor Shake Machine Heat-Treat Cycle Completion Verification
Taylor Shake Machine Heat-Treat Cycle Completion Verification
Inspection template for verifying Taylor shake machine heat-treat cycle completion, including required temperature and time holds, cooling performance, cycle timestamps, and error code review.
Equipment and Cycle Identification
-
Machine identified as Taylor shake machine / shake freezer
Confirm the inspected unit matches the intended Taylor shake machine and is the correct equipment for the recorded cycle.
-
Cycle ID or batch identifier recorded
Enter the unique cycle identifier, batch number, or production reference used to trace the heat-treat event.
-
Operator or inspector name recorded
Record the person verifying the cycle completion.
-
Inspection date and time recorded
Capture the date and time the verification was completed.
Heat-Treat Hold Verification
-
Mix temperature held above 151°F for at least 35 minutes
Record the verified hold time above 151°F. The cycle must meet or exceed 35 minutes.
-
Peak or maintained mix temperature recorded
Record the relevant temperature reading from the cycle log or display.
-
Heat-treat phase start time recorded
Record when the heat-treat hold began.
-
Heat-treat phase completion time recorded
Record when the heat-treat hold ended.
Cooling Verification
-
Mix cooled below 41°F within 90 minutes
Record the elapsed time from heat-treat completion to reaching below 41°F.
-
Final mix temperature below 41°F
Record the final stabilized mix temperature after cooling.
-
Cooling start time recorded
Record when the cooling phase began.
-
Cooling completion time recorded
Record when the mix reached the required cooling endpoint.
Error Codes, Deficiencies, and Sign-Off
-
Machine error codes reviewed and recorded
Enter any error codes shown during the cycle, or note 'none'.
-
Any cycle interruption or alarm occurred
Indicate whether the cycle was interrupted, alarmed, or aborted at any point.
-
Corrective action documented for any failure or deficiency
Describe corrective action taken or required if any item failed.
-
Inspector signature
Signature confirming the verification is complete and accurate.