Inspection template for verifying Taylor shake machine heat-treat cycle completion, including required temperature and time holds, cooling performance, cycle timestamps, and error code review.

Equipment and Cycle Identification

  • Machine identified as Taylor shake machine / shake freezer
    Confirm the inspected unit matches the intended Taylor shake machine and is the correct equipment for the recorded cycle.
  • Cycle ID or batch identifier recorded
    Enter the unique cycle identifier, batch number, or production reference used to trace the heat-treat event.
  • Operator or inspector name recorded
    Record the person verifying the cycle completion.
  • Inspection date and time recorded
    Capture the date and time the verification was completed.

Heat-Treat Hold Verification

  • Mix temperature held above 151°F for at least 35 minutes
    Record the verified hold time above 151°F. The cycle must meet or exceed 35 minutes.
  • Peak or maintained mix temperature recorded
    Record the relevant temperature reading from the cycle log or display.
  • Heat-treat phase start time recorded
    Record when the heat-treat hold began.
  • Heat-treat phase completion time recorded
    Record when the heat-treat hold ended.

Cooling Verification

  • Mix cooled below 41°F within 90 minutes
    Record the elapsed time from heat-treat completion to reaching below 41°F.
  • Final mix temperature below 41°F
    Record the final stabilized mix temperature after cooling.
  • Cooling start time recorded
    Record when the cooling phase began.
  • Cooling completion time recorded
    Record when the mix reached the required cooling endpoint.

Error Codes, Deficiencies, and Sign-Off

  • Machine error codes reviewed and recorded
    Enter any error codes shown during the cycle, or note 'none'.
  • Any cycle interruption or alarm occurred
    Indicate whether the cycle was interrupted, alarmed, or aborted at any point.
  • Corrective action documented for any failure or deficiency
    Describe corrective action taken or required if any item failed.
  • Inspector signature
    Signature confirming the verification is complete and accurate.
Ask AI Template Studio

Let's customize Taylor Shake Machine Heat-Treat Cycle Completion Verification.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?