Substation Battery Capacity Discharge Test Record

Substation Battery Capacity Discharge Test Record

Periodic inspection record for station DC battery constant-current capacity discharge testing, including cell voltages, measured ampere-hour capacity, comparison to rated capacity, and replacement decision when capacity falls below the acceptance threshold.

Inspection Details

  • Inspection date and time
  • Inspector name and qualification
    Record the technician or engineer performing the test and note qualification if required by site procedure.
  • Battery bank identification
    Enter the substation name, battery string ID, nominal DC voltage, and associated equipment designation.
  • Reference procedure or standard
    Document the governing SOP, manufacturer procedure, or IEEE-based test method used for the discharge test.
  • Test purpose

Test Setup and Conditions

  • Battery bank isolated for safe testing
    Verify the battery bank is isolated from normal service in accordance with site lockout-tagout and switching procedures.
  • Load bank or discharge equipment rated for test current
    Confirm the discharge load and test instruments are suitable for the planned constant-current test current and duration.
  • Ambient temperature at start of test
  • Battery electrolyte or cell temperature at start of test
  • Test start open-circuit battery voltage

Battery Bank Identification and Rating

  • Manufacturer and model
  • Rated capacity at specified discharge rate
    Enter the manufacturer's rated ampere-hour capacity at the applicable discharge rate and end voltage.
  • Rated discharge rate and duration
    Document the discharge rate basis used for the capacity comparison, such as the site-defined constant-current test rate.
  • Acceptance threshold for capacity
    Capacity below this threshold requires a replacement decision and corrective action.

Discharge Test Results

  • Constant-current discharge maintained throughout test
    Verify the discharge current remained within the planned test tolerance for the full test period.
  • Total discharge time achieved
  • Measured ampere-hour capacity
  • Measured capacity as a percentage of rated capacity
    Compare measured capacity to the rated capacity using the same discharge basis.
  • Lowest cell voltage recorded during discharge
  • Any cell reached the minimum allowable voltage
    Flag whether any cell or jar dropped below the site or manufacturer minimum during the test.

Cell Voltage Record

  • Cell voltage readings captured for all cells
    Document individual cell or jar voltages at the required test intervals per procedure.
  • Cell voltage log attached
    Attach the detailed cell-by-cell voltage sheet, data logger export, or photo of the recorded log.
  • Cells with abnormal voltage deviation identified
    Note any cell showing abnormal deviation, weak performance, or evidence of imbalance requiring follow-up.

Disposition, Corrective Action, and Sign-Off

  • Battery bank passes capacity acceptance threshold
    Pass only if measured capacity meets or exceeds the acceptance threshold and no critical deficiencies remain.
  • Replacement or corrective action required
    Select the disposition based on test results, with replacement required when capacity falls below 90 percent.
  • Inspector signature
Ask AI Template Studio

Let's customize Substation Battery Capacity Discharge Test Record.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?