Run: Substation Battery Capacity Discharge Test Record

Record a substation battery capacity discharge test, including setup, cell voltages, ampere-hour results, and pass/fail disposition. Use it to document wheth...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details

Record the technician or engineer performing the test and note qualification if required by site procedure.
Enter the substation name, battery string ID, nominal DC voltage, and associated equipment designation.
Document the governing SOP, manufacturer procedure, or IEEE-based test method used for the discharge test.

Test Setup and Conditions

Verify the battery bank is isolated from normal service in accordance with site lockout-tagout and switching procedures.
Confirm the discharge load and test instruments are suitable for the planned constant-current test current and duration.

Battery Bank Identification and Rating

Enter the manufacturer's rated ampere-hour capacity at the applicable discharge rate and end voltage.
Document the discharge rate basis used for the capacity comparison, such as the site-defined constant-current test rate.
Capacity below this threshold requires a replacement decision and corrective action.

Discharge Test Results

Verify the discharge current remained within the planned test tolerance for the full test period.
Compare measured capacity to the rated capacity using the same discharge basis.
Flag whether any cell or jar dropped below the site or manufacturer minimum during the test.

Cell Voltage Record

Document individual cell or jar voltages at the required test intervals per procedure.
Attach the detailed cell-by-cell voltage sheet, data logger export, or photo of the recorded log.
Note any cell showing abnormal deviation, weak performance, or evidence of imbalance requiring follow-up.

Disposition, Corrective Action, and Sign-Off

Pass only if measured capacity meets or exceeds the acceptance threshold and no critical deficiencies remain.
Select the disposition based on test results, with replacement required when capacity falls below 90 percent.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?