Splice and Termination Verification Log
Splice and Termination Verification Log
Inspection log for medium- and low-voltage cable splices and terminations documenting kit type, conductor identification, torque values, workmanship checks, and inspector sign-off to support OSHA and NFPA compliance.
Inspection Identification
- Inspection date and time recorded
- Work location, panel, vault, or equipment identified
- Circuit, feeder, or cable ID documented
- Voltage class identified
- Inspector name and company recorded
- Reference drawing, work order, or permit number
Splice and Termination Materials
- Kit type matches approved application and voltage class
- Kit part number and lot or batch number recorded
- Conductor size and insulation type match kit rating
- Lugs, connectors, and compression components are correct for the conductor
- Consumables, sealants, and stress-control materials are present and within shelf life
Torque and Connection Verification
- Specified torque value documented for each bolted connection
- Measured torque value documented for each bolted connection
- Measured torque meets specified torque within tolerance
- All connector set screws, lugs, and hardware are fully seated and secured
- Anti-oxidant compound, if required, was applied per manufacturer instructions
Workmanship and Installation Condition
- Cable jacket, insulation, and shielding are intact with no visible damage
- Splice or termination is properly aligned, supported, and strain relieved
- Insulation clearance, creepage, and spacing appear compliant with kit instructions
- Environmental conditions were suitable during installation
- Foreign material, moisture, contamination, or debris present at connection area
Testing, Sign-Off, and Corrective Action
- Insulation resistance or continuity test results documented, if required by scope
- Deficiencies or non-conformances recorded with corrective action
- Inspector sign-off completed
- Work released for service