SOC 2 Audit Evidence Collection Tracker
SOC 2 Audit Evidence Collection Tracker
Tracks each in-scope SOC 2 control against its required evidence artifact, control owner, collection cadence, and observation-period status to support audit readiness and evidence completeness.
Inspection Details
-
Observation period start date
Start date of the SOC 2 observation period being tested.
-
Observation period end date
End date of the SOC 2 observation period being tested.
-
In-scope Trust Services Criteria identified
Select the Trust Services Criteria in scope for this evidence tracker.
-
Audit owner / coordinator
Name or role of the person coordinating evidence collection.
Control-to-Evidence Mapping
-
Control identifier
Unique control ID or reference used in the SOC 2 control matrix (for example, CC6.1 or A1.2).
-
Control description matches the control matrix
Brief description of the control being evidenced; should align to the approved control matrix and Trust Services Criteria mapping.
-
Required evidence artifact identified
Specific artifact required to demonstrate the control operated during the observation period (for example, access review report, change ticket, backup log, incident record).
-
Evidence owner assigned
Person, team, or role responsible for producing and retaining the evidence artifact.
-
Collection cadence defined
How often the evidence must be collected during the observation period.
-
Evidence collection status
Current status of evidence collection for this control.
-
Evidence file or repository link
Link to the stored evidence file, ticket, repository, or document location.
Evidence Quality and Completeness
-
Artifact covers the full required period
Evidence spans the correct date range for the observation period or required sampling window.
-
Artifact is attributable to the control owner
Evidence clearly shows who performed, reviewed, or approved the control activity.
-
Artifact is legible and complete
Evidence is readable, unredacted as appropriate, and includes all pages, fields, or log entries needed for testing.
-
Evidence supports the stated control operation
The artifact actually demonstrates the control operated as designed, rather than only showing a related activity.
Exceptions, Gaps, and Follow-Up
-
Missing evidence items identified
Count of in-scope controls or samples with missing required evidence.
-
Open exceptions documented
Any known exceptions, deficiencies, or non-conformances are documented with remediation status.
-
Corrective action owner assigned
Name or role responsible for resolving evidence gaps or updating the control artifact.
-
Target remediation date
Planned date to resolve the evidence gap or collect the missing artifact.
Attestation
-
Inspector attestation
Inspector confirms the evidence tracker entry is accurate to the best of their knowledge.
-
Final review notes
Optional summary of unresolved items, assumptions, or auditor follow-up points.
Ask AI
Template Studio