Sewer Lateral CCTV Inspection Report
Sewer Lateral CCTV Inspection Report
Inspection template for documenting sewer lateral CCTV findings, including PACP-style condition coding, distance from cleanout, defects, and rehabilitation recommendations.
Inspection Job Details
-
Inspection ID recorded
Unique tracking identifier for this CCTV inspection submission.
-
Property or service address recorded
Service address or asset location for the lateral inspected.
-
Inspector name and certification status
Name of the inspector and whether PACP-certified or otherwise qualified.
-
Inspection date and time
Date and time the CCTV inspection was performed.
-
Lateral ownership or asset type
Ownership or asset classification for the lateral.
-
Inspection direction
Direction of the camera run, measured consistently from the chosen starting point.
-
Start point verified at cleanout or access point
Confirms the run begins at the intended cleanout or other designated access point.
Equipment Setup and Inspection Quality
-
Camera head and cable appropriate for pipe diameter and material
Confirms equipment selection matches the lateral size and material.
-
Image clarity sufficient to identify defects and pipe features
Overall video quality for defect identification and coding.
-
Distance counter zeroed at start point
Confirms the distance counter was reset at the start of the inspection.
-
Flow conditions documented
Observed flow condition during the CCTV run.
-
Obstructions or conditions limiting inspection noted
Documents any debris, roots, standing water, offset, collapse, or other condition that limited the inspection.
Pipe Condition and PACP-Style Defect Coding
-
Pipe material identified
Primary pipe material observed in the lateral.
-
Pipe diameter recorded
Measured or documented lateral diameter.
-
Primary pipe condition code
Overall condition assessment for the inspected lateral segment.
-
Defect type observed
Observed defects or anomalies present in the line.
-
Defect location from cleanout
Distance from the cleanout or starting point to the defect location.
-
Defect severity rating
Severity of the primary defect at the recorded location.
-
PACP-style code or observation note
Free-text field for PACP-style coding notes, defect narrative, or coding reference used by the operator.
-
Additional defect locations documented
Indicates whether additional defects were observed and recorded elsewhere in the report.
Connections, Serviceability, and Rehabilitation Recommendation
-
Main connection observed and documented
Confirms the connection to the main was observed or the termination point was documented.
-
Service lateral is structurally serviceable
Overall serviceability determination based on observed defects.
-
Recommended rehabilitation method
Recommended corrective or rehabilitation action based on the inspection findings.
-
Recommendation justification
Brief narrative explaining why the selected rehabilitation method is recommended.
-
Urgent safety hazard present
Indicates whether the inspection revealed an immediate hazard such as collapse, severe blockage, or active sanitary release.
Report Sign-Off
-
Inspection findings reviewed for completeness
Confirms the report includes the required job details, condition observations, and recommendation.
-
Photos attached for key defects and termination points
Confirms photo evidence is attached for the start point, major defects, and end point or main connection.
-
Inspector comments
Additional notes, limitations, or follow-up items for the report.
-
Inspector signature
Inspector sign-off confirming the accuracy of the report.
Ask AI
Template Studio