Loading...

Run: Sewer Lateral CCTV Inspection Report

Document sewer lateral CCTV findings with PACP-style defect coding, measured defect locations, and clear rehab recommendations. Use it to produce a defensibl...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Job Details

Unique tracking identifier for this CCTV inspection submission.
Service address or asset location for the lateral inspected.
Name of the inspector and whether PACP-certified or otherwise qualified.
Date and time the CCTV inspection was performed.
Ownership or asset classification for the lateral.
Direction of the camera run, measured consistently from the chosen starting point.
Confirms the run begins at the intended cleanout or other designated access point.

Equipment Setup and Inspection Quality

Confirms equipment selection matches the lateral size and material.
Overall video quality for defect identification and coding.
Confirms the distance counter was reset at the start of the inspection.
Observed flow condition during the CCTV run.
Documents any debris, roots, standing water, offset, collapse, or other condition that limited the inspection.

Pipe Condition and PACP-Style Defect Coding

Primary pipe material observed in the lateral.
Measured or documented lateral diameter.
Overall condition assessment for the inspected lateral segment.
Observed defects or anomalies present in the line.
Distance from the cleanout or starting point to the defect location.
Severity of the primary defect at the recorded location.
Free-text field for PACP-style coding notes, defect narrative, or coding reference used by the operator.
Indicates whether additional defects were observed and recorded elsewhere in the report.

Connections, Serviceability, and Rehabilitation Recommendation

Confirms the connection to the main was observed or the termination point was documented.
Overall serviceability determination based on observed defects.
Recommended corrective or rehabilitation action based on the inspection findings.
Brief narrative explaining why the selected rehabilitation method is recommended.
Indicates whether the inspection revealed an immediate hazard such as collapse, severe blockage, or active sanitary release.

Report Sign-Off

Confirms the report includes the required job details, condition observations, and recommendation.
Confirms photo evidence is attached for the start point, major defects, and end point or main connection.
Additional notes, limitations, or follow-up items for the report.
Inspector sign-off confirming the accuracy of the report.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?