Monthly Generator Load Test Record
Monthly Generator Load Test Record
Monthly inspection log for documenting a 30-minute emergency generator load test, including run time, load level, operating conditions, deficiencies, and corrective actions for compliance tracking.
Inspection Details
- Inspection date and time recorded
-
Generator identification recorded
Record generator ID, asset tag, location, and unit designation.
- Inspector name and role recorded
- Test type confirmed as monthly load test
- Reference SOP or log number recorded
Pre-Test Readiness
-
Generator area accessible and free of obstructions
Access to the generator, controls, and emergency shutdown path must be unobstructed.
-
Fuel level adequate for test duration
Fuel supply must be sufficient to complete the test without interruption.
- No active alarms, lockouts, or unresolved faults present before test
- Transfer switch and controls ready for test
- Required PPE available and used
Load Test Execution
- Test started and stop time recorded
-
Test duration met minimum 30 minutes
Document actual run time in minutes.
-
Load applied met minimum 30% of nameplate rating
Record the average or sustained load percentage during the test.
- Generator started and carried load without failure
- Transfer to emergency power completed successfully
-
Operating parameters remained within normal limits
Monitor voltage, frequency, oil pressure, coolant temperature, and unusual vibration or smoke.
-
Abnormal noise, smoke, leaks, or vibration observed
Mark yes if any abnormal condition was observed during the run.
Post-Test Condition and Deficiencies
- Generator returned to normal standby condition
- All alarms cleared after test
- Deficiencies identified during test
-
Corrective action documented
Describe repairs, escalation, or follow-up work needed for any deficiency.
- Responsible person and due date recorded
Final Verification and Sign-Off
- Inspection completed and reviewed
- Inspector signature
- Supervisor or maintenance review completed