Mirror-Match Parts Verification Log
Mirror-Match Parts Verification Log
Inspection log for collision repair parts coordinators to verify each received part matches the removed part before staging to the repair stall, reducing parts errors, delays, and rework.
Inspection Details
-
Repair order / claim number
Enter the active repair order, claim, or job number tied to the part verification.
-
Vehicle identifier
Record the vehicle identifier used by the shop, such as year/make/model and VIN last 8 if applicable.
-
Verification date and time
Capture when the mirror-match verification was completed.
-
Verified by
Name or identifier of the parts coordinator or verifier completing the check.
-
Reference source used
Select the source used to compare the received part against the removed part.
Mirror-Match Verification
-
Part number matches the repair order and removed part
Confirm the received part number matches the expected part number for the repair.
-
Side, orientation, and handedness match
Verify the part is the correct side and orientation, including left/right, front/rear, upper/lower, or handed configuration.
-
Mounting points, tabs, and fastener locations match
Check that mounting points, clips, tabs, brackets, and fastener locations align with the removed part.
-
Dimensions and contour match
Confirm the received part matches the removed part in overall size, shape, contour, and fitment profile.
-
Trim, finish, and color match
Verify visible trim, texture, finish, and color are correct for the vehicle and repair stage.
Technology, Features, and Hardware
-
Sensors, cameras, or electronic features match
Confirm any ADAS, sensor, heated, power, memory, or electronic features match the removed part and repair requirements.
-
Included hardware and clips are complete
Verify the received part includes required brackets, clips, retainers, seals, gaskets, and other associated hardware.
-
Part is free of shipping damage and defects
Inspect the received part for cracks, warping, scratches, broken tabs, contamination, or other defects before staging.
-
Packaging labels and part labels are legible
Confirm labels, barcodes, and packaging identifiers remain legible for traceability and inventory control.
Staging Readiness and Exceptions
-
Part is approved for staging to the repair stall
Confirm the part may be staged only after mirror-match verification is complete and any exceptions are resolved.
-
Any discrepancy identified
Indicate whether any mismatch, shortage, overage, damage, or missing hardware was found during verification.
-
Discrepancy details
Describe the specific non-conformance, including the incorrect part, missing item, or mismatch observed.
-
Corrective action taken
Select all actions taken to resolve the discrepancy or document the follow-up required.
Sign-Off
-
Parts coordinator signature
Signature confirming the mirror-match verification is complete and accurate.
-
Supervisor or estimator review
Confirm supervisory or estimator review when a discrepancy required escalation.
Ask AI
Template Studio