Foreign Material Control Program Audit
Foreign Material Control Program Audit
Inspection template for auditing foreign material controls against the site foreign material plan, including magnets, screens, knives, brittle-item controls, and physical contamination prevention practices.
Audit Scope and Foreign Material Plan Review
-
Current foreign material control plan is available and matches the audited area
Verify the plan is site-specific, current, and covers the process area being inspected.
-
Hazard points and control devices are identified in the plan
Confirm the plan identifies magnets, screens, knives, brittle items, and other physical contamination control points.
-
Recent changes to equipment, product, or layout have been assessed for foreign material risk
Check whether process changes, maintenance work, or layout changes triggered a plan review.
-
Inspection frequency and responsibilities are defined and followed
Verify the plan assigns ownership and inspection intervals for control verification.
Magnets and Metal Separation Controls
-
Magnets are installed at specified control points
Confirm magnets are present where required by the foreign material plan and positioned to intercept product flow.
-
Magnet housings, guards, and access points are intact and secure
Inspect for damage, loose fasteners, missing covers, or conditions that could reduce effectiveness.
-
Magnet strength verification is current
Confirm documented verification or pull-test results are within the required interval and meet site criteria.
-
Magnet cleaning and release records are complete
Review records showing magnets are cleaned, inspected, and cleared at the required frequency.
Screens, Sieves, and Physical Barriers
-
Screens and sieves are installed, intact, and properly seated
Verify screens are present where required and show no tears, gaps, deformation, or bypass conditions.
-
Screen mesh or opening size matches the approved specification
Confirm the installed screen matches the foreign material plan or equipment specification.
-
Screen inspection and replacement records are current
Verify documented checks are completed on schedule and damaged screens are replaced promptly.
-
Bypass or temporary removal of screens is controlled and documented
Check that any bypass condition is authorized, time-limited, and covered by corrective action or risk assessment.
Knives, Blades, and Cutting Tool Control
-
Knives and blades are controlled by issue, count, or sign-out process
Verify tools are tracked to prevent loss, breakage, or unaccounted-for fragments.
-
Blades are intact and free of chips, cracks, or missing segments
Inspect in-use cutting tools for damage that could create foreign material.
-
Blade change and disposal process is followed
Confirm used blades are removed into a controlled sharps or blade disposal container and not left in the area.
Brittle Item and Glass Control
-
Brittle items are identified on the brittle-item register
Verify glass, hard plastic, ceramic, and similar items are listed and controlled per the site program.
-
Brittle item inspections are current and documented
Confirm scheduled inspections are completed and any damaged items are removed from service.
-
Glass and brittle-item breakage response procedure is posted and understood
Check that employees know the response steps for breakage, cleanup, product hold, and release authorization.
-
Protective covers, shields, or exclusion controls are intact where required
Inspect light covers, gauges, lenses, and other brittle components for protection and integrity.
Housekeeping, Inspection Records, and Corrective Actions
-
Area is free of loose foreign material sources
Check for loose fasteners, broken plastic, wire, tape, wood, or other contamination sources in the audited area.
-
Foreign material inspection logs are complete and legible
Review logs for required checks, signatures, dates, and any noted deficiencies or non-conformances.
-
Open deficiencies have documented corrective actions and due dates
Verify corrective actions are assigned, tracked, and closed within the required timeframe.
-
Employees can explain escalation for a suspected foreign material event
Confirm personnel know when to stop the line, segregate product, notify supervision, and initiate investigation.