Inspection template for auditing foreign material controls against the site foreign material plan, including magnets, screens, knives, brittle-item controls, and physical contamination prevention practices.

Audit Scope and Foreign Material Plan Review

  • Current foreign material control plan is available and matches the audited area
    Verify the plan is site-specific, current, and covers the process area being inspected.
  • Hazard points and control devices are identified in the plan
    Confirm the plan identifies magnets, screens, knives, brittle items, and other physical contamination control points.
  • Recent changes to equipment, product, or layout have been assessed for foreign material risk
    Check whether process changes, maintenance work, or layout changes triggered a plan review.
  • Inspection frequency and responsibilities are defined and followed
    Verify the plan assigns ownership and inspection intervals for control verification.

Magnets and Metal Separation Controls

  • Magnets are installed at specified control points
    Confirm magnets are present where required by the foreign material plan and positioned to intercept product flow.
  • Magnet housings, guards, and access points are intact and secure
    Inspect for damage, loose fasteners, missing covers, or conditions that could reduce effectiveness.
  • Magnet strength verification is current
    Confirm documented verification or pull-test results are within the required interval and meet site criteria.
  • Magnet cleaning and release records are complete
    Review records showing magnets are cleaned, inspected, and cleared at the required frequency.

Screens, Sieves, and Physical Barriers

  • Screens and sieves are installed, intact, and properly seated
    Verify screens are present where required and show no tears, gaps, deformation, or bypass conditions.
  • Screen mesh or opening size matches the approved specification
    Confirm the installed screen matches the foreign material plan or equipment specification.
  • Screen inspection and replacement records are current
    Verify documented checks are completed on schedule and damaged screens are replaced promptly.
  • Bypass or temporary removal of screens is controlled and documented
    Check that any bypass condition is authorized, time-limited, and covered by corrective action or risk assessment.

Knives, Blades, and Cutting Tool Control

  • Knives and blades are controlled by issue, count, or sign-out process
    Verify tools are tracked to prevent loss, breakage, or unaccounted-for fragments.
  • Blades are intact and free of chips, cracks, or missing segments
    Inspect in-use cutting tools for damage that could create foreign material.
  • Blade change and disposal process is followed
    Confirm used blades are removed into a controlled sharps or blade disposal container and not left in the area.

Brittle Item and Glass Control

  • Brittle items are identified on the brittle-item register
    Verify glass, hard plastic, ceramic, and similar items are listed and controlled per the site program.
  • Brittle item inspections are current and documented
    Confirm scheduled inspections are completed and any damaged items are removed from service.
  • Glass and brittle-item breakage response procedure is posted and understood
    Check that employees know the response steps for breakage, cleanup, product hold, and release authorization.
  • Protective covers, shields, or exclusion controls are intact where required
    Inspect light covers, gauges, lenses, and other brittle components for protection and integrity.

Housekeeping, Inspection Records, and Corrective Actions

  • Area is free of loose foreign material sources
    Check for loose fasteners, broken plastic, wire, tape, wood, or other contamination sources in the audited area.
  • Foreign material inspection logs are complete and legible
    Review logs for required checks, signatures, dates, and any noted deficiencies or non-conformances.
  • Open deficiencies have documented corrective actions and due dates
    Verify corrective actions are assigned, tracked, and closed within the required timeframe.
  • Employees can explain escalation for a suspected foreign material event
    Confirm personnel know when to stop the line, segregate product, notify supervision, and initiate investigation.
Ask AI Template Studio

Let's customize Foreign Material Control Program Audit.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?