Loading...

Run: Foreign Material Control Program Audit

Audit foreign material controls against your site plan, including magnets, screens, knives, brittle-item controls, and cleanup practices. Use it to catch con...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Audit Scope and Foreign Material Plan Review

Verify the plan is site-specific, current, and covers the process area being inspected.
Confirm the plan identifies magnets, screens, knives, brittle items, and other physical contamination control points.
Check whether process changes, maintenance work, or layout changes triggered a plan review.
Verify the plan assigns ownership and inspection intervals for control verification.

Magnets and Metal Separation Controls

Confirm magnets are present where required by the foreign material plan and positioned to intercept product flow.
Inspect for damage, loose fasteners, missing covers, or conditions that could reduce effectiveness.
Confirm documented verification or pull-test results are within the required interval and meet site criteria.
Review records showing magnets are cleaned, inspected, and cleared at the required frequency.

Screens, Sieves, and Physical Barriers

Verify screens are present where required and show no tears, gaps, deformation, or bypass conditions.
Confirm the installed screen matches the foreign material plan or equipment specification.
Verify documented checks are completed on schedule and damaged screens are replaced promptly.
Check that any bypass condition is authorized, time-limited, and covered by corrective action or risk assessment.

Knives, Blades, and Cutting Tool Control

Verify tools are tracked to prevent loss, breakage, or unaccounted-for fragments.
Inspect in-use cutting tools for damage that could create foreign material.
Confirm used blades are removed into a controlled sharps or blade disposal container and not left in the area.

Brittle Item and Glass Control

Verify glass, hard plastic, ceramic, and similar items are listed and controlled per the site program.
Confirm scheduled inspections are completed and any damaged items are removed from service.
Check that employees know the response steps for breakage, cleanup, product hold, and release authorization.
Inspect light covers, gauges, lenses, and other brittle components for protection and integrity.

Housekeeping, Inspection Records, and Corrective Actions

Check for loose fasteners, broken plastic, wire, tape, wood, or other contamination sources in the audited area.
Review logs for required checks, signatures, dates, and any noted deficiencies or non-conformances.
Verify corrective actions are assigned, tracked, and closed within the required timeframe.
Confirm personnel know when to stop the line, segregate product, notify supervision, and initiate investigation.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?