Inspection Scope and Material Identification
-
Inspection area and material lot identified
Record the receiving area, storage location, production line, and lot or batch identifiers covered by this inspection.
-
Compostable material type clearly identified
Confirm the material type being inspected.
-
Material specification or SOP referenced
Reference the applicable specification, work instruction, or SOP used to verify handling and segregation requirements.
-
Inspector confirms inspection covers receipt, storage, and line segregation
Verify the inspection scope includes all three control points for compostable material integrity.
Receiving and Incoming Material Controls
-
Incoming compostable material matches purchase order and label
Verify the received material description, grade, and quantity match the shipping documents and container labels.
-
Packaging is intact with no visible contamination or damage
Check for torn bags, punctured film rolls, wet packaging, debris, or any visible contamination on receipt.
-
Incoming material is labeled as compostable and traceable by lot
Verify each pallet, tote, or roll is labeled with compostable status and a traceable lot or batch identifier.
-
Receiving area prevents mix-up with conventional materials
Confirm the receiving zone has physical or procedural controls that prevent commingling with conventional resin, film, or scrap.
Storage Conditions and Physical Segregation
-
Compostable materials stored in designated, clearly marked location
Verify compostable resin and film are stored in a designated area marked to prevent accidental use with conventional stock.
-
Physical segregation maintained from conventional materials
Confirm separation by rack, bay, cage, floor marking, barrier, or equivalent control is maintained at all times.
-
Storage conditions protect material integrity
Check that storage conditions prevent moisture exposure, crushing, UV damage, excessive heat, or other conditions that could degrade compostable material.
-
FIFO or lot control is followed
Verify first-in-first-out or approved lot control is used to manage material age and traceability.
Line Staging and Production Segregation
-
Only approved compostable material staged at the line
Verify the line-side staging area contains only the approved compostable resin or film for the current run.
-
Conventional material removed from line-side area before startup
Confirm no conventional resin, film, or mixed scrap is present in the active staging area, feeders, or nearby carts.
-
Dedicated tools, bins, or containers used for compostable material
Verify dedicated or cleaned tools, bins, and containers are used to prevent cross-contamination during handling.
-
Line changeover verification completed
Confirm the changeover check includes removal of prior material, verification of correct material, and release to production.
Housekeeping, Contamination Prevention, and Records
-
No visible cross-contamination in storage or staging area
Check for mixed resin, foreign material, dust, debris, or mislabeled product in the inspected area.
-
Spills, damaged packaging, or mixed material segregated and dispositioned
Verify any damaged or suspect material is isolated, labeled, and dispositioned according to site procedure.
-
Training or competency documented for material handlers
Confirm personnel handling compostable materials have documented training on segregation and contamination prevention.
-
Deficiencies and corrective actions recorded
Document any non-conformance, immediate containment, root cause, and corrective action owner with due date.