Cable Termination and Glanding Record
Cable Termination and Glanding Record
Inspection record for verifying cable terminations, gland type and rating, lug torque, polarity, and screen bonding at both ends.
Inspection Details
-
Circuit, panel, or equipment identifier recorded
Record the exact cable/circuit reference, panel name, equipment tag, or feeder identifier.
-
Inspection date and time recorded
Document when the termination and glanding verification was completed.
-
Inspector name and qualification recorded
Enter the inspector name and confirm the person is authorized or competent for electrical verification.
-
Work status identified
Select whether the cable is new installation, re-termination, maintenance repair, or post-test verification.
-
Reference drawing, SOP, or torque specification available
Confirm the applicable drawing, wiring schedule, manufacturer instruction, or torque specification is available at the point of inspection.
Cable Gland and Entry Verification
-
Correct gland type installed for cable construction
Verify the gland type matches the cable construction, including armored, unarmored, screened, or hazardous-area requirements as applicable.
-
Gland rating matches enclosure and environment
Confirm the gland rating is suitable for the enclosure ingress protection, environmental exposure, and any hazardous-area classification where applicable.
-
Gland installed correctly with no visible damage
Check that the gland is fully engaged, mechanically secure, and free from cracks, deformation, or thread damage.
-
Cable outer sheath is properly retained and sealed
Verify the outer sheath is retained by the gland and the entry is sealed without gaps, loose components, or exposed conductors.
-
Earth tag, shroud, or sealing washer installed where required
Confirm all required gland accessories are fitted according to the cable type and installation method.
Termination and Lug Torque Verification
-
Conductor termination matches drawing and terminal designation
Verify each conductor is landed on the correct terminal, phase, or device point per the approved wiring diagram.
-
Lug size and conductor size are compatible
Confirm the lug is correctly sized for the conductor cross-section and terminal stud or clamp arrangement.
-
Lug torque value recorded
Record the applied torque for each termination or the representative torque value used for the set.
-
Applied torque meets specified torque requirement
Confirm the measured torque is within the specified tolerance for the lug, terminal, and hardware combination.
-
Termination hardware secure and correctly assembled
Check that washers, spring washers, nuts, and lock devices are installed in the correct order and fully secured.
Polarity, Phase Identification, and Screen Bonding
-
Polarity or phase identification verified at termination
Confirm polarity, phase sequence, or conductor identification is correct against the wiring schedule and test results.
-
Cable screen or shield bonded at the designated end(s)
Verify the screen or shield is bonded exactly as specified, including single-end or both-end bonding requirements.
-
Screen bonding continuity verified
Confirm the screen bonding connection is continuous, mechanically secure, and free from loose strands or poor contact.
-
Earthing or grounding conductor termination verified
Check that the protective earth or grounding conductor is terminated to the correct point and is secure.
-
End-to-end identification labels present and legible
Verify cable markers, ferrules, or labels are installed and legible at both ends where required.
Deficiencies, Corrective Action, and Sign-Off
-
Deficiencies or non-conformances documented
Record any defects, deviations, or non-conformances found during the inspection, including location and impact.
-
Corrective action assigned and tracked
Document the corrective action, responsible person, and target completion date for any failed item.
-
Inspector signature
Inspector confirms the record is accurate and complete.
-
Supervisor or commissioning sign-off
Optional supervisory or commissioning approval for release to service, where required by site procedure.