Run: Cable Termination and Glanding Record

Cable Termination and Glanding Record template for checking gland selection, lug torque, polarity, and screen bonding before energizing equipment. Use it to ...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details

Record the exact cable/circuit reference, panel name, equipment tag, or feeder identifier.
Document when the termination and glanding verification was completed.
Enter the inspector name and confirm the person is authorized or competent for electrical verification.
Select whether the cable is new installation, re-termination, maintenance repair, or post-test verification.
Confirm the applicable drawing, wiring schedule, manufacturer instruction, or torque specification is available at the point of inspection.

Cable Gland and Entry Verification

Verify the gland type matches the cable construction, including armored, unarmored, screened, or hazardous-area requirements as applicable.
Confirm the gland rating is suitable for the enclosure ingress protection, environmental exposure, and any hazardous-area classification where applicable.
Check that the gland is fully engaged, mechanically secure, and free from cracks, deformation, or thread damage.
Verify the outer sheath is retained by the gland and the entry is sealed without gaps, loose components, or exposed conductors.
Confirm all required gland accessories are fitted according to the cable type and installation method.

Termination and Lug Torque Verification

Verify each conductor is landed on the correct terminal, phase, or device point per the approved wiring diagram.
Confirm the lug is correctly sized for the conductor cross-section and terminal stud or clamp arrangement.
Record the applied torque for each termination or the representative torque value used for the set.
Confirm the measured torque is within the specified tolerance for the lug, terminal, and hardware combination.
Check that washers, spring washers, nuts, and lock devices are installed in the correct order and fully secured.

Polarity, Phase Identification, and Screen Bonding

Confirm polarity, phase sequence, or conductor identification is correct against the wiring schedule and test results.
Verify the screen or shield is bonded exactly as specified, including single-end or both-end bonding requirements.
Confirm the screen bonding connection is continuous, mechanically secure, and free from loose strands or poor contact.
Check that the protective earth or grounding conductor is terminated to the correct point and is secure.
Verify cable markers, ferrules, or labels are installed and legible at both ends where required.

Deficiencies, Corrective Action, and Sign-Off

Record any defects, deviations, or non-conformances found during the inspection, including location and impact.
Document the corrective action, responsible person, and target completion date for any failed item.
Inspector confirms the record is accurate and complete.
Optional supervisory or commissioning approval for release to service, where required by site procedure.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?