ASHRAE 188 Water Management Plan Annual Review
ASHRAE 188 Water Management Plan Annual Review
Annual inspection template for reviewing a building water management program under ASHRAE 188, including team roster verification, sample point review, action and corrective limits, and document revision control.
Review Record and Scope
-
Annual review date recorded
Record the date the annual review was completed.
-
Building or facility name matches the water management plan
Confirm the review is tied to the correct building, campus, or facility.
-
Current water management plan revision date documented
Record the revision date of the controlled water management plan document.
-
Review scope includes all applicable building water systems
Select all water systems included in the annual review.
Water Management Team Roster
-
Water management team roster is current
Confirm the roster reflects current personnel and roles.
-
Team includes designated program owner or responsible manager
Verify a responsible person is assigned for program oversight.
-
Team includes operations or maintenance representative
Verify operations or maintenance participation in the review.
-
Team includes qualified technical or environmental health support as needed
Confirm technical support is available for risk assessment and control decisions.
-
Roster changes since last annual review documented
List any additions, removals, or role changes since the prior review.
Sample Points and Control Locations
-
Representative sample points are identified for each applicable system
Confirm sample points are defined for each managed water system.
-
Sample points remain accessible and clearly labeled
Verify sample locations can be reached and identified during routine monitoring.
-
Sample point list matches current building conditions
Confirm the list reflects current piping, fixtures, equipment, and occupied areas.
-
Control locations and monitoring frequencies reviewed
Verify control points and monitoring intervals are still appropriate for the system.
-
Changes to sample points documented with rationale
Describe any added, removed, or relocated sample points and why the change was made.
Action Limits and Corrective Limits
-
Action limits are defined for applicable control parameters
Verify action limits exist for monitored parameters such as temperature, disinfectant residual, or other control measures.
-
Corrective limits are defined for applicable control parameters
Verify corrective limits are established for out-of-range conditions.
-
Limits are documented in measurable terms
Confirm limits are stated as measurable values or ranges rather than general statements.
-
Response steps are linked to each action or corrective limit
Verify the plan identifies who responds and what actions are taken when limits are exceeded.
-
Limit changes since last review documented
Record any updates to action limits or corrective limits and the reason for the change.
Corrective Actions and Sign-Off
-
Deficiencies or non-conformances identified during review
List any gaps, missing records, or plan deficiencies found during the annual review.
-
Corrective actions assigned with due dates
Document assigned corrective actions, owners, and target completion dates.
-
Reviewer signature
Signature of the person completing or approving the annual review.
-
Management approval signature
Signature of management or program authority acknowledging the review.