Loading...

Run: Vacuum Interrupter Integrity Open-Gap Withstand Test

Use this Vacuum Interrupter Integrity Open-Gap Withstand Test template to record high-voltage open-gap results, confirm vacuum bottle integrity, and document...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Identification

Record the breaker, recloser, or switchgear asset ID, location, and vacuum interrupter designation being tested.
Enter the date and time the open-gap withstand test was performed.
Record the inspector name and the qualified/competent person overseeing the test.

Safety Controls and Test Readiness

Verify the equipment is isolated, de-energized, and controlled under an approved lockout-tagout procedure per OSHA 1910.147.
Confirm PPE selection is appropriate for the test setup and voltage exposure, consistent with the site electrical safety program and NFPA 70E.
Confirm the test boundary is established, warning signs are posted, and unauthorized personnel are excluded.

Test Equipment and Setup

Record the withstand test set model, serial number, and calibration due date.
Verify leads, clamps, and grounding connections are intact, properly rated, and free of visible damage.
Confirm the vacuum interrupter contacts are fully open and the test circuit is connected across the open contacts as required by the procedure.

Withstand Test Parameters

Record the actual applied withstand voltage used for the open-gap test.
Record the duration that voltage was applied across the open vacuum interrupter contacts.
Record the applicable acceptance criterion or procedure reference used for this test, including the required withstand level.

Results and Deficiencies

Indicate whether the vacuum interrupter withstood the applied voltage across open contacts without flashover, puncture, or dielectric breakdown.
Indicate whether the test result suggests loss of vacuum, such as withstand failure or abnormal discharge behavior.
Describe any deficiency, non-conformance, or failed interrupter and note the immediate disposition, such as remove from service, retest, or escalate for replacement.

Sign-Off

Document any corrective action, work order, or follow-up required after the test.
Inspector attestation that the test was performed and recorded accurately.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free