Loading...

Run: Test and Balance Field Report by Zone

Use this zone-level TAB field report to record design versus actual airflow and hydronic flow, final damper and valve positions, and any deficiencies in one ...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Project and Report Identification

Enter the specific building, HVAC system, and zone being reported.
Record the certified TAB firm and the technician who performed the measurements.
Optional reference to the field log, revision number, or test package.

Safety and Test Preconditions

Confirm the zone is accessible and free of immediate hazards before measurements begin.
Verify lockout-tagout controls are in place for any equipment requiring safe access per OSHA 1910.147.
Record whether airflow, pressure, temperature, and flow instruments used for the field report are in calibration.
Confirm doors, access panels, and operating conditions are sufficient to obtain representative readings.
Document any access restrictions, unstable system conditions, or deviations from the approved procedure.

Zone Air Balance Measurements

Enter the design supply or return airflow for the zone.
Enter the measured actual airflow for the zone.
Record the difference between design and actual airflow, positive or negative.
Record the final damper position after balancing.
Identify the terminal unit, grille, diffuser, or register associated with this zone reading.

Zone Hydronic Balance Measurements

Enter the design hydronic flow for the zone coil or terminal unit.
Enter the measured actual water flow for the zone coil or terminal unit.
Record the difference between design and actual water flow, positive or negative.
Record the final control valve position after balancing.
Identify the coil, valve, or terminal unit associated with this zone reading.

Deficiencies and Non-Conformances

Flag any zone measurement that is outside project tolerance or approved balancing criteria.
Describe the deficiency, non-conformance, or unresolved balancing issue.
Identify the contractor, controls vendor, or TAB firm responsible for follow-up.

Certification and Sign-Off

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?