Run: Subcontractor Field Quality Verification Audit

Use this Subcontractor Field Quality Verification Audit to confirm subcontractor work matches the work order, checklist, and workmanship standard before clos...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Audit Scope and Jobsite Identification

Record the site, work order, and task scope being verified.
Document the subcontractor firm and crew lead present during the audit.
The assigned checklist, work instruction, or SOP must be available and being used in the field.
Inspector can safely access the work area without exposure to uncontrolled hazards.

Workmanship and Installation Quality

Check visible alignment and finish against project requirements and company workmanship standards.
Verify that visible attachment points are secure, complete, and appropriate for the installed material or equipment.
Confirm the installed materials, parts, and finishes match the approved scope, submittal, or work order.
Look for cosmetic and functional defects such as damage, poor fit-up, exposed edges, or contamination.
Assess whether the installation suggests poor first-pass quality or repeated correction.

Checklist Completion and Task Execution

Verify that required setup, verification, or pre-start steps were completed before field work started.
Confirm that any required hold points, witness points, or supervisor approvals were followed.
Verify the work followed the assigned sequence and did not skip required steps.
Confirm that any required readings, test results, or verification records were captured.

Safety Coordination and Field Controls

Check for task-appropriate PPE and compliance with site rules and hazard controls.
Verify the work area is orderly, with tools, cords, and materials managed safely.
Confirm compliance with site energy isolation controls and OSHA 1910.147 or applicable construction procedures when the task required it.
Assess whether the subcontractor communicated effectively and avoided interference with other work activities.

Documentation, Communication, and Closeout

Confirm the field record is complete, readable, and consistent with observed work.
Verify that any non-conformance was escalated promptly through the proper channel.
Record any open items, responsible party, and due date for correction.
Confirm the subcontractor left the area in a safe and orderly condition.

Inspector Findings and Sign-Off

Select the final outcome of the audit.
Summarize any non-conformances, root causes, and required follow-up actions.
Inspector sign-off confirming the audit findings.