Run: Steam Trap Survey and Tagging Report

Use this Steam Trap Survey and Tagging Report to record trap ID, location, condition, and replacement priority during ultrasonic and infrared inspections. It...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Survey Identification and Scope

Record the plant area, unit, line, or system included in this survey.
Capture when the steam trap survey was performed.
Record the name and role of the person performing the survey.
Select the detection methods used for this trap assessment.
Record the steam header, branch line, equipment train, or process served by the trap.
Confirm all accessible steam traps in the assigned scope were inspected.

Steam Trap Identification and Tagging

Record the permanent tag number or unique identifier attached to the trap.
Record the exact physical location, including building, floor, bay, or equipment reference.
Select the steam trap design observed in the field.
Record the equipment or service served, such as heat exchanger, drip leg, tracing, or process equipment.
Confirm the trap could be safely reached for inspection without removing guards or violating lockout-tagout requirements.

Operating Condition Assessment

Rate the trap's ultrasonic condition based on field findings.
Rate the thermal pattern observed at the trap inlet, outlet, and downstream piping.
Select the observed operating condition of the trap.
Indicate whether the trap appears to be leaking live steam or passing steam to condensate return.
Confirm condensate is being discharged as expected without excessive backup or flooding.
Record the measured temperature difference across the trap or associated piping.

Replacement Priority and Corrective Action

Assign the maintenance priority based on condition, energy loss risk, and service impact.
Describe the required action, such as repair, replacement, retest, insulation repair, or follow-up inspection.
Record any estimated loss, severity note, or supporting observation used for prioritization.
Enter the maintenance work order number, action request, or follow-up tracking reference.
Confirm whether the trap condition creates an urgent safety, reliability, or energy concern requiring escalation.

Closeout and Inspector Sign-Off

Confirm the survey log includes every trap inspected in the assigned scope.
Record any traps that could not be inspected, missing tag IDs, inaccessible locations, or other deficiencies.
Indicate whether photos, thermal images, or ultrasonic notes were attached to support the survey record.
Inspector sign-off confirming the survey findings are accurate and complete.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?