Loading...

Run: Progressive Network Compliance Checklist

Use this Progressive Network Compliance Checklist to verify priority repair handling, cycle time control, on-site estimate completion, file accuracy, and bas...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details

Record the inspected facility name, site address, and department or bay area visited.
Capture the date and time the inspection began.
Inspector must sign to confirm findings and observations.

Priority Service Handling

Priority or DRP-designated files are visibly marked in the management system and/or on the repair order.
Assess whether priority files are routed promptly to estimating, teardown, parts, and production planning.
Verify that communication milestones are documented for priority repairs, including estimate, supplements, parts, and delivery updates.
A clear escalation process exists for files that exceed target cycle time or are blocked by parts, supplements, or approvals.

Cycle Time Controls

Verify that current cycle time targets or production goals are visible to the team and used in daily management.
Check that the facility tracks key milestones such as estimate complete, parts ordered, teardown complete, supplement approved, and delivery scheduled.
Enter the current average days in process for Progressive network files.
Assess whether supplements are reviewed promptly and submitted with complete documentation to avoid cycle time loss.

On-Site Estimate Completion

Verify that the estimator completes the estimate on-site whenever the vehicle condition and program workflow allow it.
Check that the estimate documents all visible damage, VIN/odometer as applicable, and required photo evidence.
Confirm that the customer was informed of the estimate outcome, next steps, and any required approvals or supplements.
Record the elapsed time from vehicle arrival to estimate completion for the inspected file or sample.

Documentation and File Control

Verify that the file contains complete documentation supporting the estimate, supplements, and final repair plan.
Check that ordered parts, backorders, and ETA updates are current in the file or system.
Confirm that supplement submissions, approvals, and revisions can be traced without gaps.

Safety and Facility Compliance

Verify that exit routes are clear, marked, and usable in accordance with OSHA 1910.36 and NFPA 101 expectations.
Check that extinguishers are accessible, properly mounted, and show current inspection status per OSHA 1910.157 and NFPA 10 practices.
Inspect for damaged cords, daisy-chaining, exposed conductors, or unsafe temporary wiring conditions.
Verify appropriate PPE is available and observed in use where required, such as eye protection, gloves, hearing protection, or respirators as applicable.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free