Run: Post-Installation Field QA Inspection

Use this post-installation field QA inspection to verify a newly installed asset is mounted, connected, labeled, tested, and ready for handover. It helps cat...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details and Site Readiness

Confirm asset tag, model, serial number, location, and installation scope match the work order or turnover package.
Verify access is unobstructed, housekeeping is acceptable, and any temporary barriers or controls are in place.
Confirm current approved drawings, permits, test records, and installation documentation are available for review.
Record the date/time of inspection and the inspector completing the QA check.

Mounting, Alignment, and Physical Installation

Verify the asset is firmly secured to its base, frame, wall, pad, or support structure with no visible looseness or instability.
Check that bolts, fasteners, brackets, shims, anchors, and vibration isolation components are present and installed per specification.
Measure and confirm installation alignment meets project or manufacturer tolerance requirements.
Verify required working clearances, access panels, and maintenance space are not obstructed.
Inspect for dents, cracks, missing parts, coating damage, leaks, or other visible non-conformances.

Connections, Utilities, and Safety Controls

Verify electrical, mechanical, piping, data, drainage, or other required connections are installed and secured.
Check for proper routing, strain relief, support, bend radius, and protection from abrasion or pinch points.
Confirm guards, covers, disconnects, lockout points, interlocks, and other safety devices are present and functional as applicable. Reference OSHA 1910.147 for lockout-tagout where applicable.
Verify equipment labels, circuit IDs, flow direction markers, hazard warnings, and asset identification are present and readable.
Confirm grounding or bonding connections are installed and appear continuous where required by design or code.

Functional Verification and Performance

Confirm the asset starts, energizes, or initializes as intended without unusual noise, vibration, odor, arcing, alarms, or leaks.
Verify the installed asset performs its intended function during test or trial operation.
Record key field measurements such as voltage, current, pressure, flow, temperature, speed, or signal level as applicable.
Verify pushbuttons, switches, displays, status lights, alarms, and control logic respond as expected.
Confirm there are no open safety issues, active fault codes, leaks, or unresolved non-conformances that prevent handover.

Closeout, Documentation, and Handover Readiness

Record any deficiencies, non-conformances, or follow-up actions required before acceptance.
Attach photos, redlines, test results, and other closeout evidence needed for turnover.
Inspector confirms the field QA review is complete and ready for the next step or handover decision.