Run: Plumbing Permit Application and Inspection Tracker

Track plumbing permit applications, AHJ requirements, rough-in, water test, gas test, and final closeout in one inspection record. Use it to keep jurisdictio...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Permit and AHJ Details

Enter the jurisdiction or agency responsible for plan review and inspections.
Record the issued plumbing permit number exactly as shown on the permit card or application.
Select the current permit status.
Enter the site address covered by the plumbing permit.
Record the date and time the permit was issued, if available.
Capture jurisdiction-specific notes, conditions, or comments tied to the permit application.

Pre-Inspection Readiness

Approved drawings, permit card, or inspection paperwork is available for the inspector.
Piping, fixtures, and test points are accessible without obstruction.
Pressure gauges, test plugs, or other required equipment are present and within calibration or verification date.
PPE, access control, and site safety conditions are adequate for the inspection activity.

Rough-In Inspection

Confirm that the rough-in inspection has been scheduled or requested with the AHJ.
Record the date and time of the rough-in inspection.
Installed piping, fittings, and routing match the approved permit documents and scope.
Supports, hangers, protection from damage, and required clearances are acceptable for rough-in.
List any deficiencies, non-conformances, or correction items identified during rough-in inspection.

Water Test Inspection

Confirm whether the jurisdiction requires a water test for this plumbing scope.
Record the date and time the water test was performed.
Enter the water test pressure used during the inspection.
Enter the duration of the water test.
No visible leakage, pressure loss, or other failure was observed during the test period.

Gas Test Inspection

Confirm whether gas piping is included and a gas test is required for this permit.
Record the date and time of the gas test.
Enter the pressure used for the gas test.
No leakage, pressure drop, or unsafe condition was observed during the gas test.

Final Inspection and Closeout

Confirm that the final inspection has been requested with the AHJ.
Record the date and time of the final inspection.
Select the outcome of the final inspection.
Document any deficiencies, non-conformances, or correction items identified at final inspection.
Confirm that the permit has been closed or final approval has been recorded by the AHJ.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?