Run: Partial Discharge Test - Solid Dielectric Module

Record partial discharge readings for epoxy-encapsulated and solid dielectric switchgear modules, with setup, measurement, defects, and sign-off captured in ...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Test Identification and Scope

Record the module serial number, part number, voltage class, and test station identifier.
Confirm this is a 100 percent routine test on a cast solid dielectric or epoxy-encapsulated module.
Enter the applicable internal procedure, customer specification, or test method reference used for this inspection.

Safety Preconditions and Test Setup

Verify the test article and associated circuits are de-energized and controlled per site lockout-tagout procedure.
Confirm barriers, signage, and access control are in place to keep unauthorized personnel clear of the test area.
Select all PPE used for the test setup and measurement activity.
Confirm the partial discharge detector, sensors, and any coupling or measurement accessories are within calibration date.

Environmental and Instrument Conditions

Record ambient temperature at the test location.
Record relative humidity at the test location.
Confirm the electromagnetic or acoustic background level does not prevent reliable partial discharge measurement.
Select the partial discharge detection method used for this test.

Partial Discharge Measurements

Record the applied test voltage during the measurement.
Record the measured partial discharge magnitude at the specified test point.
Identify the module, phase, bushing, termination, or other location where the reading was taken.
Confirm the reading is repeatable and not caused by transient interference or setup instability.

Defects, Findings, and Disposition

Record whether the test or visual review identified signs of voids, cracks, delamination, tracking, or other insulation anomalies.
Document the disposition for any non-conformance, including re-test, repair, hold, or reject status.
Attach photos of the test setup, instrument display, or any defect indication as applicable.

Final Review and Sign-Off

Confirm the module meets the acceptance criteria for the routine partial discharge test.
Inspector or competent person sign-off confirming the record is complete and accurate.
Record when the inspection record was completed and reviewed.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?