Loading...

Run: Nondestructive Testing (NDT) Weld Report Log

Log weld NDT results in one place, from method and coverage to acceptance status and corrective action. Use it to document inspections consistently, support ...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Identification

Unique NDT report or log number for traceability.
Project name, asset ID, spool number, or work order reference.
Weld number, joint ID, grid location, line number, or drawing reference.
Date and time the examination was performed.
Name of the qualified NDT examiner or inspector.
Procedure number, acceptance criteria, drawing, or contract specification used for the examination.

Safety and Test Readiness

Area is accessible, barricaded as needed, and free of conditions that would compromise the examination or personnel safety.
Select all PPE used during the inspection.
Confirm lockout-tagout, hot work controls, or other site controls were in place as applicable.
Surface preparation, cleanliness, and accessibility are adequate for the selected NDT method.
Inspection equipment, gauges, or instruments were verified within the required calibration interval.

NDT Method and Examination Details

Primary nondestructive examination method used for this report.
Extent of inspection performed, such as full weld length, selected segments, or percentage coverage.
Record probe type, film or source details, yoke, penetrant, developer, couplant, or other method-specific materials.
Record relevant settings such as frequency, angle, exposure, dwell time, magnetization direction, or sensitivity level.
Record the standard, block, or reference artifact used to establish sensitivity or acceptance.
Inspector qualification or certification was valid for the method used.

Results and Acceptance

Describe any relevant indications, discontinuities, or lack of relevant indications.
Record exact location of each indication, including weld segment, distance from reference point, and side if applicable.
Record length, depth, density, amplitude, or other measured extent as applicable to the method.
The reported results were evaluated against the applicable acceptance criteria.
Final acceptance status of the weld or examination area.
Indicate whether the examination found a defect or non-conformance requiring disposition.
Attach photos of indications, setup, or marked weld locations when applicable.

Disposition and Closeout

Describe repair, rework, engineering review, or hold status if the weld was rejected or requires follow-up.
Indicate whether a follow-up NDT examination is required after repair or rework.
Inspector or reviewer signature confirming the report is complete and accurate.
Confirm required stakeholders were notified of the result, rejection, or release status if applicable.
Select all supporting records included with the report package.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?