Loading...

Run: NFRC Label Application and Verification Audit

Audit each window or door NFRC label before shipment to confirm the CPD number, U-factor, and SHGC match the certified configuration. Use it to catch mislabe...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Setup and Product Identification

Record the unit identifier, product type, size, and job or order number being inspected.
Enter the CPD number from the certification record used to verify the applied NFRC label.
Confirm the audit occurred before the unit left the facility or was released to the field.
Select the records used to confirm the correct label and ratings.

NFRC Label Content Verification

The label CPD number must match the certified product record exactly.
Enter the U-factor shown on the applied label and compare it to the certified value.
Enter the Solar Heat Gain Coefficient shown on the applied label and compare it to the certified value.
Confirm the label corresponds to the correct window or door configuration, including frame type, glazing package, and size family as applicable.

Label Placement, Condition, and Readability

The label must be firmly attached and not loose, torn, or partially detached.
All required label information must be readable without removing packaging or damaging the unit.
Verify the label is placed in the approved location for the product type and is visible for field verification.
Rate the physical condition of the label after application.

Traceability and Release Control

The inspected unit must be traceable to the production batch, lot, or traveler tied to the certified configuration.
If a mismatch or defect was found, the unit must be identified, segregated, or placed on hold to prevent shipment.
Describe the non-conformance, containment action, and disposition if a label mismatch or other deficiency was found.
Confirm release authority reviewed the audit result before shipment when a discrepancy, rework, or exception occurred.

Inspector Sign-Off

Record any observations, deviations, or follow-up actions.
Inspector sign-off confirming the audit was completed accurately.
Record when the audit was completed.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?