Run: Medical Gas Piping Verification Inspection - NFPA 99

Medical Gas Piping Verification Inspection - NFPA 99 records pressure testing, cross-connection checks, particulate cleanliness, and final tie-in readiness b...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Identification

Document the project name, facility name, building/wing, system identifier, and service type being verified.
Record the date and time the verification inspection was performed.
Confirm the inspector/verifier is qualified to perform medical gas verification testing as required by the project and NFPA 99 workflow.

Pre-Test Conditions and Safety

Verify required permits, shutdown notifications, and Authority Having Jurisdiction requirements are in place before testing.
Confirm the test boundary is isolated, tagged, and clearly identified to prevent unintended service interruption or cross-connection.
Verify gauges, pressure devices, and any particulate test equipment are calibrated and traceable to current certification.
Select the components that are installed and included in the verification scope.

Pressure Test Verification

Confirm the test medium used for pressure testing matches the approved procedure and project requirements.
Record the applied test pressure used for the verification test.
Record the duration the system held test pressure during observation.
Confirm the piping section maintained pressure with no visible leakage, deformation, or other deficiency during the hold period.

Cross-Connection and Label Verification

Confirm the cross-connection test was performed on the medical gas piping system.
Verify that outlets, piping, valves, and source connections are correctly connected to the intended gas service and no cross-connection exists.
Confirm piping, outlets, valves, and source components are labeled with the correct gas designation and directional identification where required.
Verify terminal units, manifold connections, and source points correspond to the documented medical gas service and installation drawings.

Particulate Cleanliness and Final Tie-In

Confirm particulate cleanliness testing was completed for the piping section as required by the project specification and verification procedure.
Verify the particulate test result met the acceptance criteria for the medical gas piping system.
Confirm the system is approved for final tie-in only after successful verification testing and required corrections are complete.

Deficiencies and Sign-Off

Record all deficiencies, non-conformances, corrective actions, and retest requirements.
Signature of the qualified verifier completing the inspection.