Loading...

Run: IGU Primary and Secondary Sealant Bead Inspection

Use this IGU Primary and Secondary Sealant Bead Inspection template to verify bead continuity, width, thickness, and corner workmanship around the full perim...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details and Unit Identification

Record unit ID, job number, lite size, spacer type, and inspection location.
Verify the applicable sealant bead specification, drawing, or approved sample is available for comparison.
Confirm the inspector used the correct gauge, caliper, or visual reference method required by the work instruction.
Confirm all four edges and corners can be inspected without obstruction.

Primary Sealant Bead Inspection

Check for uninterrupted primary sealant coverage around all edges with no skips, voids, or breaks.
Measure bead width at representative locations and compare to the approved specification.
Measure bead thickness at representative locations and compare to the approved specification.
Verify the primary sealant appears properly seated and bonded to the spacer and glass surfaces with no visible separation.

Secondary Sealant Bead Inspection

Check for uninterrupted secondary sealant coverage around all edges with no gaps, skips, or open areas.
Measure bead width at representative locations and compare to the approved specification.
Measure bead thickness at representative locations and compare to the approved specification.
Verify the bead profile is uniform, without excessive ridges, pinholes, or untooled areas that could affect durability.

Corners, Edge Conditions, and Workmanship

Inspect all corners for complete sealant coverage, proper overlap, and no visible pull-back, fisheyes, or voids.
Verify sealant coverage is consistent along straight runs and transitions, with no thin spots or exposed spacer edges.
Select any observed defects that may affect long-term argon retention or seal integrity.

Closeout and Corrective Action

Document each deficiency by edge, corner, and defect type so corrective action can be assigned.
Select the inspection disposition for the unit.
Inspector signs to confirm the inspection was completed and findings are accurate.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?