Loading...

Run: Excess Flow Valve Installation Verification

Use this EFV installation verification template to confirm whether an excess flow valve is required, installed correctly, and documented for annual reporting...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details and Service Line Identification

Enter the service address, customer account, or work order reference used to identify the gas service line.
Identify whether the work was a new installation, replacement, repair, or other service activity.
Confirm whether the service line falls within the customer classes typically subject to EFV installation requirements.
Record the date and time of the field verification or record review.
Enter the inspector's name, title, or role performing the verification.

EFV Applicability and Eligibility Review

Verify that the line was evaluated for EFV applicability based on service type, customer class, and work scope.
Confirm that no approved exemption, exception, or documented non-applicability applies to this service line.
Record the final eligibility determination for the service line.
Describe the basis for the eligibility decision, including customer class, service work type, or exemption rationale.
Select the records used to verify EFV applicability and installation status.

EFV Installation Verification

Verify that an excess flow valve is installed on the applicable gas service line.
Confirm the EFV location matches the approved installation detail, service configuration, or utility standard.
Verify the valve is installed in the correct flow direction and connected without visible defects, leaks, or improper fittings.
Attach a photo showing the EFV installation or supporting field evidence.
Record the date the EFV installation was completed or verified complete.

Documentation, Reporting, and Records

Confirm the EFV installation status has been entered into the utility's official record system.
Verify the data needed for annual EFV reporting has been completed and is ready for aggregation.
Document any missing EFV, ineligible service, or record discrepancy as a deficiency or non-conformance.
Describe the corrective action, responsible party, and target completion date if a deficiency was identified.

Safety, Compliance, and Sign-Off

Confirm there are no unresolved critical deficiencies remaining at closeout.
Inspector signs to confirm the accuracy of the verification.
Optional supervisory sign-off for compliance review and annual reporting validation.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?