Run: Electrical Trim-Out Inspection Checklist

Use this Electrical Trim-Out Inspection Checklist to verify final device, fixture, and panel labeling work before turnover. It helps catch missing cover plat...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details

Record the project name, inspected area, floor/room number, and date of inspection.
Enter the inspector name and the electrical foreman, supervisor, or responsible lead for follow-up.
Confirm this inspection is being performed at the trim-out phase after rough-in and before final turnover.

Devices and Receptacles

Verify switches, receptacles, and other devices are aligned, firmly mounted, and not loose in the box.
Check that all plates are present, properly sized, unbroken, and fully cover the opening without exposed conductors or box edges.
Confirm device type, color, rating, and configuration match the approved plans, submittals, and room schedule.
Verify required TR or WR devices are installed in the correct locations per design and code requirements.
Inspect for physical damage, heat discoloration, arcing evidence, or visible conductor issues.

Luminaires and Lighting Controls

Verify fixtures are firmly mounted, properly supported, and located per the approved lighting layout.
Confirm all fixture components are present, seated correctly, and free from cracks, chips, or missing parts.
Test switches, dimmers, occupancy sensors, and other controls for proper on/off operation and intended response.
Verify emergency lighting and exit-related fixtures operate as intended during test conditions.
Confirm fixture tags, control labels, or circuit identifiers are present and legible where specified.

Panel Directory and Circuit Identification

Verify each breaker or circuit is identified clearly and matches the actual loads served.
Check that field-installed labels correspond to the current room and equipment assignments.
Verify the deadfront or panel cover is installed correctly, secured, and free of missing screws or open knockouts.
Inspect the enclosure interior for wire clippings, packaging, tools, or other contamination.
Confirm the panel is accessible and not blocked by stored materials or installed finishes.

GFCI and AFCI Functional Testing

Test each required GFCI device or breaker using the test function and verify reset restores power.
Test each required AFCI device or breaker using the test function and verify reset restores power.
Confirm downstream protection is present and functioning for circuits intended to be protected by a device or breaker.
Record the device location, test result, and any indicator status or fault condition observed during testing.

Deficiencies and Closeout

List all deficiencies, non-conformances, and punch-list items with exact location and required correction.
Attach photos showing the issue and, when available, the corrected condition.
Inspector signature confirming the inspection was completed and findings were recorded.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?