Run: Custody Transfer System Pre-Transfer Verification

Pre-transfer verification checklist for custody transfer systems, covering gauge readings, sensor status, ullage and trim corrections, and transfer readiness...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details

Record the custody transfer system, tank number, line ID, or meter run being verified.
Document when the pre-transfer verification was completed.
Enter the inspector's name and job title or qualification level.
Record the procedure, work order, or transfer authorization used for this inspection.

Primary Level Gauge Verification

Confirm the primary level gauge is present, legible, and not obstructed.
Record the observed level and confirm it is within the approved tolerance for the transfer condition.
Confirm the gauge reference point or datum has been verified against the approved standard.
Inspect for physical damage, leaks, sticking, or other defects that could affect measurement accuracy.

Temperature and Pressure Sensor Verification

Record the temperature reading and compare it to the expected product condition or reference instrument.
Record the pressure reading and compare it to the expected operating condition or reference instrument.
Confirm the temperature sensor is within its calibration interval or has current verification status.
Confirm the pressure sensor is within its calibration interval or has current verification status.

Accuracy Checks and Corrections

Confirm the required periodic accuracy check was performed against the approved reference or proving method.
Confirm ullage or empty-space correction was calculated and applied according to the approved procedure.
Confirm trim correction was calculated and applied for vessel or tank attitude as required by the procedure.
Record any discrepancy between reference and field readings, including corrective action or escalation if needed.

Transfer Readiness and Compliance

Confirm there are no unresolved deficiencies, critical items, or non-conformances that would prevent transfer.
Verify all primary measurement instruments used for the transfer have current calibration or verification status.
Confirm any maintenance hold, lockout-tagout, or isolation status has been cleared before transfer authorization.