Loading...

Run: Cruise Ship Tender Boat Pre-Operation Inspection

Pre-operation inspection for cruise ship tender boats used for shore transfers. Use it to verify engine readiness, lifesaving gear, passenger limits, and cox...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Setup

Verify vessel name/ID, date, time, and intended route or shore-transfer assignment.
Confirm the inspection is being performed prior to passenger boarding and vessel departure.

Engine and Propulsion Readiness

Engine starts without abnormal delay, warning lights, alarms, or unusual vibration/noise.
Check oil level against manufacturer specification before operation.
Verify cooling water intake, hoses, and visible lines are unobstructed and free of leaks.

Fuel and Fluid Levels

Confirm fuel level is sufficient for the planned route, contingencies, and return or standby requirements.
Inspect bilge, fuel lines, fittings, and engine compartment for leaks or strong fuel odor.
Verify any required hydraulic, transmission, or coolant levels are within manufacturer limits.

Safety and Lifesaving Equipment

Confirm a life ring is onboard, clearly visible, and immediately accessible for emergency use.
Verify the number of approved life jackets meets or exceeds the maximum persons expected onboard.
Verify required extinguisher(s) are onboard, in serviceable condition, and unobstructed.
Confirm the emergency stop or engine cut-off device is present and functional.

Passenger Capacity and Operating Controls

Verify the posted maximum passenger capacity is displayed where passengers and crew can readily see it.
Confirm seating, deck surfaces, and boarding paths are free of trip hazards and loose gear.
Verify required radios, lights, and any navigation aids are operational for the planned transfer.

Coxswain Qualification and Release

Confirm the operator holds the required qualification, authorization, and current assignment for this vessel and route.
Record any deficiencies, corrective actions, and whether the vessel is released or held out of service.
Inspector signs to confirm the pre-operation inspection was completed accurately.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free