Critical Lift Plan Documentation captures the approvals, load data, crane setup, site conditions, and communication checks needed before a non-routine crane ...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Lift Plan Authorization

Documented lift plan is present, current, and approved by the responsible competent person or designated authority before crane setup begins.
Lift meets site criteria for a critical lift, engineered lift, tandem lift, personnel-adjacent lift, or other non-routine operation requiring enhanced controls.
Lift briefing reviewed the sequence, roles, hazards, exclusion zone, stop-work authority, and emergency actions with all involved personnel.
A competent person and qualified signal person are assigned and understood by the crew.
Any required permits, engineered calculations, customer approvals, and site authorization documents are available at the jobsite.

Load and Rigging Verification

Actual or calculated load weight is documented, including all rigging, hooks, spreaders, and attachments to be lifted.
Center of gravity is identified and accounted for in the lift plan and rigging arrangement.
Slings, shackles, hooks, spreaders, and other rigging hardware are rated for the load and compatible with the lift geometry.
All rigging components were inspected before use and show no visible damage, deformation, excessive wear, or missing identification.
Load attachment points, lifting lugs, and connection hardware are verified as suitable for the planned lift path and forces.

Crane Configuration and Capacity

Crane type, make/model, boom length, counterweight, jib, and outrigger configuration are recorded in the lift plan.
Planned working radius is measured and matches the crane chart configuration used for capacity calculations.
Planned load, including rigging and dynamic factors, remains within the crane's rated capacity for the selected configuration and radius.
Calculated load percentage at the planned radius is documented and reviewed for critical lift criteria.
Required crane safety devices are present and functional for the planned operation.

Ground Bearing and Site Conditions

Ground or support surface capacity has been reviewed and is adequate for crane loading, outrigger reactions, and lift path conditions.
Mats, pads, or cribbing are installed per the lift plan and sized for the expected load distribution.
Crane setup area is level within the tolerance specified by the manufacturer or lift plan.
Power lines, structures, plant equipment, and other obstructions are identified and controlled for the planned boom path and load path.
Wind, visibility, precipitation, and lightning conditions are within the limits established by the lift plan and manufacturer guidance.

Communication, Exclusion Zone, and Final Sign-Off

Primary communication method is defined, including hand signals, radio channel, or designated signal person authority.
Barricades, spotters, or other controls prevent unauthorized personnel from entering the lift area.
Tag lines or other approved load control methods are available where needed to control rotation and swing.
Crew understands that any worker may stop the lift if conditions change or a hazard is identified.
Responsible supervisor or competent person authorizes the lift after all critical items are verified.