Loading...

Run: Cathodic Protection Annual Test Station Reading Log

Annual cathodic protection test station reading log for recording pipe-to-soil potentials, verifying CP criteria, and documenting deficiencies and corrective...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details

Record the pipeline name/ID, segment or milepost, and test station number or location.
Enter the inspector or technician name and any required qualification or certification reference.
Document conditions that could affect readings, such as rain, frozen ground, standing water, or access limitations.
Confirm this inspection is the annual cathodic protection test station reading log for the pipeline.
Identify the applicable company procedure, corrosion control plan, or reference criteria used for the inspection.

Reference Electrode and Test Setup

Select the reference electrode used for the reading, such as copper/copper sulfate (CSE).
Electrode is intact, clean, and suitable for use; no visible damage or contamination.
Meter, leads, and connections are secure, undamaged, and operating properly before taking readings.
Test station is accessible without unsafe excavation, traffic exposure, or physical obstruction.
Reading method accounts for IR drop or uses an approved instant-off / depolarized method where required by procedure.

Pipe-to-Soil Potential Readings

Record the measured pipe-to-soil potential at the test station.
Record any additional reading required by the procedure, such as native, polarized, or depolarized potential.
Confirm the measured potential meets the applicable cathodic protection acceptance criterion used by the operator.
Repeat reading is within expected tolerance and does not indicate a loose connection, interference, or unstable condition.
Indicate whether interference, stray current, or other abnormal conditions were observed during the reading.
Attach a photo showing the meter reading, test station, or setup if required by site procedure.

Deficiencies and Corrective Actions

Select any deficiencies or non-conformances observed during the inspection.
Indicate whether follow-up action is needed to restore or verify cathodic protection performance.
Describe the corrective action taken or recommended, including retest, repair, adjustment, or escalation.
Record the date and time for a follow-up reading if required.

Sign-Off

Confirm all required readings, observations, and corrective actions are documented accurately.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?