Run: AWWA C600 Water Main Hydrostatic Test Report

Document a water main hydrostatic test with the fields needed to record segment details, test pressure, two-hour hold results, leakage calculation, and accep...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Test Identification

Record the project name, test location, pipe segment limits, and stationing or drawing reference.
Document when the hydrostatic test began.
Record names and roles of the inspector, contractor representative, and any witnessing authority.

Main and Test Segment Details

Document pipe material, nominal diameter, and total test length for the segment.
Select all items included in the test section.
Verify the main is isolated, restrained, and ready for pressure testing without unintended movement.

Pre-Test Readiness and Safety

Verify gauges, pumps, hoses, and fittings are in serviceable condition and appropriate for the required pressure range.
Record the stabilized gauge reading used for the test.
Verify access control, traffic control, and PPE are in place; no unsafe conditions are present during pressurization.

Hydrostatic Test Execution

Confirm the main was held at the specified test pressure for a continuous two-hour period in accordance with the acceptance procedure.
Document the pressure at the start and end of the hold period, including any observed fluctuations.
Record the measured leakage observed during the test hold period.

Leakage Calculation and Acceptance

Record the allowable leakage calculation used for the test, including the basis and any formula inputs.
Confirm the measured leakage did not exceed the allowable leakage for the test segment.
Mark whether the water main hydrostatic test is accepted based on pressure hold and leakage criteria.

Deficiencies, Corrective Actions, and Sign-Off

Record any leaks, pressure loss, equipment issues, or other non-conformances observed during the test.
Describe repairs, retesting requirements, or follow-up actions needed before acceptance.
Inspector signs to confirm the record is complete and accurate.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?