Run: ASTM C216 Face Brick Lot Sampling and Acceptance Inspection

Use this ASTM C216 face brick lot sampling and acceptance inspection to trace each lot, document visual and dimensional checks, and record ASTM C67 test sele...

Fill this out, get a PDF emailed to you. No account required. Want to run it with your team and track results? Sign up free →

Inspection Details and Lot Identification

Record project name, plant name, inspector name, date, and inspection location.
Document lot number, production date range, shipment ID, pallet count, and any associated mill or kiln run identifiers.
Confirm the lot is being evaluated as face brick under ASTM C216 and that the correct product classification is identified.
Confirm the required acceptance tests will be performed using ASTM C67 procedures as applicable to the lot.

Sampling Plan and Chain of Custody

Enter the number of units sampled from the lot for inspection and testing.
Verify the number of units pulled matches the approved sampling plan for the lot and plant procedure.
Confirm units were selected from the lot in a manner that represents the production run and shipment condition, without obvious bias.
Confirm sampled units were labeled, secured, and transferred without mix-up or loss of identity.

Visual and Dimensional Acceptance

Check for cracks, severe chips, warpage, laminations, or other defects that would constitute a non-conformance for face brick acceptance.
Verify the sampled units are consistent with the approved color range, texture, and finish for the specified face brick product.
Record measured length, width, and height for the sampled units or the applicable dimensional summary used for acceptance.
Confirm measured dimensions and tolerances meet the approved project specification and ASTM C216 acceptance criteria.

ASTM C67 Test Selection and Results

Select the tests required for this lot based on the product specification and acceptance plan.
Confirm the specimens submitted to the lab correspond to the sampled lot units and were not substituted.
Enter the test results, including measured values, pass/fail status, and any relevant averages or ranges.
Confirm the ASTM C67 results and any project-specific acceptance limits are satisfied for the lot.

Disposition, Deficiencies, and Sign-Off

List any deficiencies, deviations from the sampling plan, damaged units, or failed tests.
Select the final disposition for the lot based on inspection and test results.

Get your results

Enter your email — we'll send you a PDF of your filled-out template, plus the occasional MangoScoop newsletter (templates, workflow tips, product updates). Unsubscribe anytime — link is in every email.

Generated with MangoApps Templates — browse 250+ free
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?