Inspection log for tracking each weld joint to the welder, WPS, heat numbers, NDE results, and repair history to support quality control and traceability.

Inspection Details

  • Project, area, and weld map identifier recorded
    Enter the project name, work area, spool/assembly identifier, and weld map or travel sheet number.
  • Inspection date and inspector recorded
    Record the date/time of the traceability review and the person performing the inspection.
  • Applicable WPS, code, and revision identified
    Document the approved WPS number, governing code or specification, and current revision used for the welds reviewed.
  • Inspection scope covers all joints in the defined weld map
    Confirm the review includes every joint listed on the weld map or travel sheet for the selected scope.

Weld Map and Joint Identification

  • Each joint is uniquely identified on the weld map
    Verify each weld joint has a unique joint number, location reference, or spool reference that matches the field marking and map.
  • Joint location and orientation are clearly shown
    Confirm the weld map shows the joint location, line or assembly reference, and orientation sufficient to locate the weld in the work.
  • Joint status is current and legible
    Check that the joint status on the map is readable and reflects the current state such as fit-up, welded, inspected, accepted, repaired, or closed.
  • Weld map matches field markings and spool tags
    Verify the joint identifiers on the map match the physical markings, tags, or traveler labels in the work area.
  • Missing or duplicate joint numbers identified
    Confirm there are no missing, duplicated, or conflicting joint numbers within the reviewed weld map.

Welder, Procedure, and Material Traceability

  • Welder ID recorded for each completed joint
    Verify each welded joint is linked to a welder identification number or stamp on the map or travel sheet.
  • Welder qualification is valid for the work performed
    Confirm the welder qualification record is current and matches the process, position, material group, and thickness range required for the weld.
  • Base material heat number recorded
    Verify the base material heat number or mill traceability identifier is documented for each applicable joint or component.
  • Filler metal or consumable lot traceability recorded
    Confirm the filler metal classification and lot or batch number are documented where required by the project quality plan or specification.
  • WPS matches joint material, process, and position
    Check that the listed WPS is appropriate for the joint material, welding process, joint design, and position used.

Inspection, NDE, and Repair History

  • Required NDE type and extent are documented
    Verify the required NDE method(s) and inspection extent are identified for each joint or weld group, such as VT, PT, MT, RT, or UT.
  • NDE report number and result linked to each joint
    Confirm each applicable joint references the correct NDE report number, date, and disposition such as accepted, rejected, or pending.
  • Repairs or rework are documented with revision history
    Verify any repair, rework, or excavation history is recorded with the repair date, reason for repair, and updated disposition.
  • Repair welds reference the original joint and repair cycle
    Confirm repaired joints retain traceability to the original weld number and show the number of repair cycles completed.
  • Open defects or pending dispositions are clearly flagged
    Check that any open non-conformance, hold point, or pending NDE disposition is clearly identified on the log.

Completeness, Control, and Sign-Off

  • All required supporting documents are attached or referenced
    Verify the log includes or references the weld map, WPS, welder qualifications, MTRs or heat records, NDE reports, and repair records as applicable.
  • Document revision control is current
    Confirm the weld map and traceability log show the latest approved revision and that superseded records are controlled.
  • Deficiencies and non-conformances recorded
    Document any missing traceability, illegible entries, mismatched records, or other non-conformances identified during the review.
  • Inspector sign-off completed
    Inspector signs to confirm the weld map and traceability review is complete and accurate for the scope inspected.
Ask AI Template Studio

Let's customize Weld Map and Traceability Log.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?