Vacuum Interrupter Open-Gap Withstand Test Inspection
Vacuum Interrupter Open-Gap Withstand Test Inspection
Inspection template for recording high-voltage withstand results across open vacuum interrupter contacts to verify vacuum integrity and identify loss of vacuum through withstand failure.
Inspection Identification
-
Equipment identification recorded
Enter the switchgear, breaker, or vacuum interrupter asset ID, serial number, or unique equipment tag.
-
Test location recorded
Enter the facility, room, lineup, cubicle, or field location where the test was performed.
-
Test date and time recorded
Record when the withstand test was performed.
-
Reason for test documented
Select the operational reason for performing the test.
Safety and Test Readiness
-
Lockout-tagout applied and verified
Confirm the equipment is de-energized and isolated under an approved lockout-tagout procedure.
-
Qualified personnel and test boundaries established
Confirm only qualified personnel are present and the test area is controlled.
-
Required PPE available and worn
Select all PPE used for the test activity.
-
Test instrument and leads inspected
Confirm the hipot/test set, leads, grounding, and connectors are in safe condition with no visible damage.
Test Setup and Equipment
-
Test instrument identification recorded
Enter the make, model, and serial number of the high-voltage test set or hipot unit.
-
Calibration status current
Confirm the test instrument calibration is current and traceable.
-
Open-gap test configuration verified
Confirm the vacuum interrupter contacts are open and the test is configured across the open gap.
-
Grounding and discharge arrangement verified
Confirm proper grounding and discharge procedures are in place before and after the test.
Withstand Test Results
-
Applied test voltage recorded
Enter the applied high-voltage withstand level used for the test.
-
Test duration recorded
Enter the duration that voltage was held across the open contacts.
-
Withstand result
Select whether the interrupter maintained dielectric withstand across the open gap.
-
Evidence of vacuum loss or dielectric breakdown observed
Select any abnormal observations during the withstand test.
Deficiencies and Corrective Actions
-
Deficiency or non-conformance documented
Describe any deficiency, abnormal reading, or failed test condition.
-
Corrective action initiated
Record the immediate corrective action, repair plan, or escalation taken after a failed test.
-
Equipment tagged out of service if failed
Confirm failed equipment was removed from service or otherwise controlled pending disposition.
Sign-Off
-
Inspector signature
Signature of the person performing the inspection/test.
-
Reviewer or supervisor acknowledgment
Optional review signature for QA, maintenance, or supervisory approval.