Loading...

Transit Safety Risk Assessment Matrix Worksheet

Transit Safety Risk Assessment Matrix Worksheet

Worksheet for transit agencies to identify hazards, rate likelihood and severity, calculate risk level, and prioritize mitigations as part of the SMS Safety Risk Management process.

Assessment Details

  • Assessment date
  • Assessment scope and location
    Describe the route, facility, yard, station, shop, or operating area being assessed.
  • Assessor name and role
    Enter the name and job title of the person completing the assessment.
  • SMS / agency safety plan reference
    Reference the applicable safety plan, procedure, or program document used for this assessment.

Hazard Identification

  • Hazard description
    Describe the observable hazard or unsafe condition in specific terms.
  • Hazard location or operating context
    Identify where the hazard occurs, such as platform, roadway, maintenance bay, bus stop, or crossing.
  • Exposed persons or assets
    Select all that apply for who or what may be affected by the hazard.
  • Existing controls in place
    Document current controls, barriers, procedures, training, signage, or PPE already in use.

Risk Rating Matrix

  • Likelihood rating
    Select the likelihood score based on the agency matrix.
  • Severity rating
    Select the severity score based on the worst credible consequence.
  • Risk level
    Determine the overall risk level from the matrix result.
  • Risk score calculation
    Enter the calculated risk score or matrix value used to prioritize the hazard.

Mitigation Planning

  • Recommended mitigation actions
    Describe the actions needed to reduce the risk using the hierarchy of controls where practical.
  • Mitigation priority
    Select the implementation priority based on the assessed risk.
  • Responsible owner
    Identify the person, department, or contractor responsible for implementing the mitigation.
  • Target completion date
    Enter the planned completion date for the mitigation action.

Review, Escalation, and Sign-Off

  • Residual risk after mitigation
    Rate the remaining risk after proposed controls are applied.
  • Escalation required to management or safety committee
    Indicate whether the hazard requires escalation due to severity, uncertainty, or residual risk.
  • Corrective action follow-up notes
    Document follow-up items, monitoring needs, or interim controls until mitigation is complete.
  • Inspector signature
Ask AI Template Studio

Let's customize Transit Safety Risk Assessment Matrix Worksheet.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?