Tile Substrate Acceptance Inspection
Tile Substrate Acceptance Inspection
Inspection template for verifying tile substrate readiness, including flatness, moisture conditions, crack-isolation membrane installation, and primer application before tile work begins.
Project and Substrate Identification
-
Project area and substrate type identified
Record the room/area, substrate material, and scope of tile work.
-
Reference documents available on site
Verify applicable drawings, specifications, product data, and installation instructions are available for review.
-
Substrate installation complete and ready for inspection
Confirm the substrate has been installed and is ready for acceptance review before tile work begins.
-
Inspection conditions suitable for evaluation
Verify lighting, access, and work area conditions allow a reliable inspection of the substrate surface.
Surface Flatness and Condition
-
Surface flatness within project tolerance
Measure substrate flatness against project requirements and record the maximum deviation.
-
Surface free of dust, debris, laitance, and contaminants
Confirm the substrate is clean and suitable for bonding tile materials.
-
Cracks, spalls, and surface defects identified and addressed
Verify visible cracks, spalls, voids, or other defects have been evaluated and corrected per specification.
-
Substrate soundness confirmed by tapping or equivalent method
Check for hollow-sounding areas, delamination, or loose sections that could affect tile performance.
-
Transitions, joints, and edges prepared for tile installation
Verify edges, terminations, and transitions are properly formed and ready for tile layout and movement accommodation.
Moisture and Environmental Readiness
-
Moisture test results within acceptable limits
Record the measured moisture condition using the specified test method and compare to project acceptance criteria.
-
Surface visibly dry and free of standing water
Confirm there is no visible moisture, condensation, or standing water on the substrate.
-
Ambient temperature and humidity acceptable for installation
Verify environmental conditions are within the limits required by the tile and setting material manufacturers.
-
Moisture mitigation or curing period completed
Confirm any required curing time, drying period, or moisture mitigation process has been completed before tile work begins.
Crack-Isolation Membrane Installation
-
Crack-isolation membrane installed where specified
Verify membrane placement matches the project documents and covers all required areas.
-
Membrane coverage continuous and properly overlapped
Check for continuous coverage, correct seams, and no gaps, fishmouths, or unbonded areas.
-
Membrane fully bonded and free of wrinkles or blisters
Confirm the membrane is securely adhered and free from defects that could compromise tile performance.
-
Membrane installation matches manufacturer instructions
Verify primer, adhesive, cure time, thickness, and installation method comply with the membrane manufacturer requirements.
Primer and Final Acceptance
-
Primer applied where required
Confirm primer has been applied to all specified surfaces before tile installation.
-
Primer coverage uniform and within manufacturer requirements
Check for complete, even coverage with no missed areas, puddling, or contamination.
-
All deficiencies documented with corrective actions
List any non-conformances, required repairs, responsible party, and target completion date.
-
Substrate accepted for tile installation
Final determination that the substrate is ready for tile work to begin.