Switchgear Acceptance Test
Switchgear Acceptance Test
Inspection template for switchgear acceptance testing audits aligned with NETA standards, covering pre-energization checks, insulation, continuity, and primary injection testing.
Job Information and Safety Preconditions
- Switchgear lineup, feeder, and equipment identifiers match the test scope
- Lockout-tagout applied and verified before work begins
- Arc-flash and shock boundaries established and communicated
- Qualified personnel and required PPE are present for the task
- Test instruments are calibrated and within current certification date
- Work area is clear, dry, and free of unauthorized personnel
Visual and Mechanical Inspection
- Nameplates, circuit labels, and feeder identification are legible and match drawings
- Enclosure, barriers, and covers are installed with no visible damage or missing hardware
- Bus, terminations, and cable connections are clean, secure, and properly torqued
- Grounding and bonding conductors are installed and continuous
- Mechanical operation of breakers, racking mechanisms, and interlocks is smooth and unobstructed
- Foreign material, debris, and shipping restraints have been removed
Insulation Resistance Testing
- Test voltage applied per approved procedure
- Insulation resistance - phase A to ground
- Insulation resistance - phase B to ground
- Insulation resistance - phase C to ground
- Insulation resistance between phases is within acceptable limits
Continuity and Functional Verification
- Ground continuity verified from enclosure to grounding system
- Control wiring continuity verified against wiring diagrams
- Breaker close/trip functions operate correctly
- Protective relays, indicators, and auxiliary devices function as intended
- Interlocks prevent unsafe or unintended operation
Primary Injection Testing
- Primary injection test setup matches approved test plan
- Injected current value
- Trip pickup and trip time are within expected tolerance
- Phase rotation and current balance verified where applicable
- No abnormal heating, noise, or nuisance operation observed during test
Final Acceptance and Closeout
- All deficiencies and non-conformances documented with corrective actions
- Equipment released for energization
- Inspector signature