Subcontractor Safety Pre-Qualification

Subcontractor Safety Pre-Qualification

GC due diligence on a new subcontractor before mobilization. Captures EMR, OSHA 300 logs, written safety program, and safety personnel qualifications.

Company Safety Profile

  • Experience Modification Rate (EMR) provided for the most recent 3 policy years
    Record the EMR values and confirm the most recent value is available. Review for trend and unusually high risk.
  • EMR is at or below the GC's acceptable threshold
    Confirm the subcontractor meets the project's prequalification EMR standard.
  • Total recordable incident rate (TRIR) provided for the most recent 3 policy years
    Capture TRIR history to assess injury trend and safety performance.
  • Subcontractor has no unresolved serious OSHA citations or willful violations in the last 3 years
    Review available compliance history and note any material enforcement actions.

OSHA Injury and Illness Records

  • OSHA 300 logs provided for the required review period
    Confirm the subcontractor supplied OSHA 300 logs for the requested years.
  • OSHA 300A annual summaries provided and signed
    Verify annual summaries are complete and signed where required.
  • OSHA 301 incident reports available for recordable cases, if applicable
    Confirm supporting incident reports are available when recordable cases exist.
  • Injury trend review completed and documented
    Summarize notable patterns, repeat incidents, or elevated risk areas identified from the logs.

Written Safety Program

  • Current written safety program provided
    Verify a formal safety program exists and has been submitted for review.
  • Program includes hazard assessment, PPE, incident reporting, and disciplinary enforcement
    Select the required program elements that are present and documented.
  • Program addresses OSHA 1926 construction hazards applicable to the scope
    Confirm the program covers relevant construction safety requirements for the subcontractor's work.
  • Program review date and revision control are current
    Record the program version, revision date, and whether it appears current for the work scope.

Safety Personnel Qualifications

  • Designated safety contact or safety manager identified
    Confirm the subcontractor has named a primary safety contact for project coordination.
  • Safety personnel qualifications documented
    Capture certifications, years of experience, and relevant training for the safety lead or competent person.
  • Competent person assigned for scope-specific hazards
    Confirm a competent person is assigned where required for the subcontractor's work activities.
  • Training records available for supervisors and field personnel
    Verify current training records are available for supervisors and personnel performing the work.

Project Mobilization Readiness

  • Project-specific hazard analysis or JHA completed
    Confirm the subcontractor has prepared a job hazard analysis or equivalent task-specific hazard review.
  • Required permits, licenses, and certifications are current
    Verify any required trade licenses, equipment certifications, or permits are current before mobilization.
  • Open deficiencies documented with corrective action and due date
    List any non-conformances identified during prequalification and the agreed corrective action plan.
Ask AI Template Studio

Let's customize Subcontractor Safety Pre-Qualification.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?