Subcontractor Closeout Compliance Checklist
Subcontractor Closeout Compliance Checklist
Inspection template for verifying each subcontractor has submitted required closeout documents, including warranties, O&M manuals, as-builts, waivers, and final compliance items at project completion.
Inspection Setup and Project Identification
- Project name, subcontractor name, and trade scope are identified
- Closeout review date is recorded
- Review covers the correct subcontractor closeout package and contract scope
- Responsible reviewer and approver are identified
Required Closeout Documents
- Warranty documents have been submitted for all applicable installed systems and equipment
- Operation and maintenance manuals have been submitted
- As-built drawings have been submitted and match the installed conditions
- Manufacturer cut sheets, product data, and submittal closeout records are included where required
- Spare parts, attic stock, tools, and special maintenance items have been delivered if required by contract
Waivers, Releases, and Payment Closeout
- Conditional lien waiver has been submitted, if required
- Final unconditional lien waiver has been submitted, if required
- All release forms and closeout affidavits are signed and dated
- No outstanding claims, retainage issues, or unresolved payment disputes are documented
Compliance, Safety, and Code References
- Applicable OSHA construction safety documentation has been provided where required
- Applicable fire-life-safety or equipment compliance references have been included where required
- Required permits, inspection sign-offs, and AHJ approvals are included in the closeout file
- Any open deficiencies, non-conformances, or punch-list items are documented with disposition
Document Quality and Record Control
- Submitted documents are legible, complete, and signed where required
- Document revisions, dates, and project identifiers are consistent across the closeout package
- Electronic and/or hard-copy turnover files are organized and stored in the approved project repository
- Any missing, incomplete, or conflicting records are listed for follow-up
Closeout Status and Sign-Off
- Overall subcontractor closeout status
- Corrective actions or follow-up items are assigned with due dates
- Inspector signature