SF6 Gas Fill and Moisture Dew-Point Check
SF6 Gas Fill and Moisture Dew-Point Check
Pre-shipment inspection for gas-insulated switchgear to record SF6 fill pressure and verify moisture or dew-point readings against specification before release.
Inspection Details
-
Equipment identification recorded
Record the switchgear model, serial number, bay/cell identifier, and shipment lot or work order.
-
Inspection date and time recorded
Capture the date and time the SF6 fill and moisture/dew-point check was completed.
-
Inspector name and qualification recorded
Record the inspector name and confirm the inspection was performed by an authorized or competent person.
SF6 Fill Pressure Verification
-
SF6 fill pressure measured
Record the final SF6 fill pressure for the unit.
-
Fill pressure matches specification
Confirm the measured fill pressure is within the approved engineering specification for this unit.
-
Fill valve and fittings show no visible leakage
Inspect the fill valve, connections, and accessible fittings for visible signs of leakage, damage, or loose connections.
Moisture / Dew-Point Verification
-
Moisture or dew-point reading recorded
Record the measured moisture content or dew-point value for the SF6 gas.
-
Moisture or dew-point value meets specification
Confirm the measured moisture or dew-point value is within the approved limit for shipment.
-
Test instrument calibration status verified
Confirm the moisture or dew-point instrument used for the measurement is within calibration and suitable for trace moisture testing.
Gas Quality and Unit Condition
-
SF6 gas quality documentation available
Verify gas purity or supplier certification is available when required by the work instruction or customer specification.
-
Unit shows no visible damage or contamination
Check the enclosure, gauges, labels, and accessible surfaces for damage, contamination, or abnormal condition.
-
All required labels and shipping marks present
Confirm identification labels, gas warning labels, and shipping marks are present and legible.
Release and Documentation
-
Non-conformances documented
Record any deficiency, non-conformance, or corrective action needed before shipment.
-
Unit approved for shipment
Confirm the switchgear may be released for shipment only after all critical checks pass and required documentation is complete.
-
Inspector signature captured
Inspector signs to confirm the SF6 fill pressure and moisture/dew-point checks were completed and recorded accurately.