RTU Gas Heat Section Pre-Heating Season Inspection
RTU Gas Heat Section Pre-Heating Season Inspection
Pre-heating season inspection for the gas heat section of a packaged rooftop unit (RTU), covering igniter resistance, flame sensor condition, heat exchanger visual inspection, gas train integrity, and flue/venting checks.
Unit Identification and Safety Setup
- RTU identified and work order matches unit location
- Lockout-tagout applied before opening gas heat compartment
-
PPE appropriate for gas heat inspection worn
Select all PPE used for this inspection.
-
Area around RTU safe and accessible
Verify roof access, clear footing, and unobstructed access to the unit.
Ignition Components
- Igniter resistance measured within manufacturer specification
- Igniter element free of cracks, chips, or discoloration
- Igniter wiring and connectors secure with no heat damage
- Ignition compartment free of debris and moisture
Flame Sensor and Burner Area
- Flame sensor cleaned and free of oxidation or buildup
- Flame sensor positioned correctly in burner flame path
- Burners show no visible rust, blockage, or abnormal wear
- Burner compartment clean and free of lint, soot, or loose insulation
Heat Exchanger and Gas Train
- Heat exchanger visually inspected for cracks, corrosion, holes, or soot trails
- Gas valve, unions, and fittings show no visible leakage or deterioration
- Gas piping supports and joints are secure
- Combustion air openings unobstructed
Flue and Venting
- Flue/vent path clear of blockage, nesting, corrosion, or damage
- Flue termination secure and properly routed
- No evidence of flue gas leakage, staining, or backdraft at compartment
Ask AI
Template Studio