Residential HVAC Rough-In Walk-Through Inspection
Residential HVAC Rough-In Walk-Through Inspection
Pre-drywall inspection template for verifying residential HVAC rough-in, including duct runs, register and return locations, equipment placement, venting, support, and code/manufacturer compliance before walls are closed.
Inspection Details and Reference Documents
- Project address, lot/unit, and inspection date recorded
- Approved mechanical plans and permit set available on site
- Installation verified against manufacturer instructions and AHJ requirements
Equipment Location and Clearances
- Air handler, furnace, or indoor unit set in approved location
-
Required service clearances maintained around equipment
Verify access for filter replacement, coil service, burner service where applicable, and panel removal.
- Equipment platform, hanger, or support is secure and level
- Refrigerant line set and condensate routing are protected and routed without damage risk
Ductwork Layout, Sizing, and Support
- Supply and return duct runs match approved layout
-
Duct sizing appears consistent with design and branch takeoffs
Check main trunks, branch ducts, and transitions for obvious undersizing, crushing, or unapproved reductions.
-
Ducts are properly supported and hung at appropriate intervals
Look for secure straps, hangers, and support at joints, offsets, and long horizontal runs.
- Duct joints, seams, and connections are sealed and mechanically fastened
- Flexible duct runs are not kinked, crushed, or excessively stretched
Registers, Returns, and Vent Terminations
- Supply register locations match plans and room layout
- Return air openings are correctly located and unobstructed
-
Bath, kitchen, dryer, or other exhaust vent terminations are routed to approved exterior locations
Verify terminations are not blocked, damaged, or terminating in prohibited locations.
- Registers, grilles, and boots are securely installed and aligned
Combustion Air, Venting, and Safety Provisions
- Combustion air openings or ducts provided where required
- Flue venting is routed, supported, and connected per approved design
-
Vent penetrations are properly sealed and clear of combustible interference
Verify clearances to framing, insulation, and other materials per manufacturer instructions and applicable code.
- Condensate drain slope and trap arrangement are installed correctly
Pre-Drywall Readiness and Sign-Off
- No open deficiencies that would be concealed by drywall
- Required photos captured for rough-in verification
- Inspector or competent person signature completed